| Location: | Texas |
|---|---|
| Posted: | Aug 5, 2026 |
| Due: | Aug 7, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA466126R0008 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Work under this project shall consist of providing all plant, labor, equipment, appliances, materials, and performing all operations required to cover the fabrication and erection of new Blast Deflector Fences for the B1-B. All work shall comply with the contract specifications and shall be in accordance with the latest International Building Code (IBC), National Fire Codes, Unified Facilities Criteria (UFC), Engineering Technical Letters (ETL’s), and all applicable Federal, State and local regulations/codes.
The blast deflector shall be of the curved, non-perforated, galvanized, corrugated type, with corrugations running in a horizontal direction. The Lynnco Type GS-20-2 as manufactured by Blast Deflectors, Inc shall beconsidered as the standard for this work. At the option of the Contracting Officer, alternate types of blast deflectorsmay be considered provided the drawings and specifications of alternate types are approved by Contracting Officer.The blast fence shall be furnished and installed by a manufacturer/contractor with blast fence experience. The blastfence shall be capable of withstanding the afterburner throttle at 30,000 lbs thrust of a B1-B Bomber engine nozzle 90 ft/ (min.) from front of deflector foundation. Extrapolated temperature is approx. 1400 ℉ velocity @ 900 MPH.
Haul Route: Approved haul route is from the Tye Gate, Third Street, Ave E, Second Street, to Flightline. Haul Route subject to change based on Flightline Restrictions. Contractors are required to use the Tye Gate for all access.
Construction Storage Yard & Contractor Limits: Contractor shall store all equipment and material within the designed laydown yard. Contractors shall restore this area to pre-construction conditions. Regardless of the area,the yard shall be fenced. Contractor shall keep the fence well maintained and the site clean and mowed. Contractor shall obtain approval for any project limits changes prior to construction commencement from 7 CES through the Contracting Officer. The approved laydown yard will be provided at the pre-construction meeting.
Contractor shall provide material submittals for all materials & products used in the project on an AF Form 3000. All PDFs shall be from original electronic documents; no scans allowed due to file size.Work is located in a restricted area. The contractor shall submit a two-week schedule to the Escort POC at least one week prior to work starting to ensure escorts are assigned. The schedule should include start/end times for each day, crew sizes, and work locations.
Note: This post is for market research purposes only. No proposals will be reviewed or accepted at this time.
| Aug 7, 2026 | [Sources Sought (Updated)] Construction Airfield Blast Shield |
| Aug 18, 2026 | [Presolicitation (Original)] Construction Airfield Blast Shield |

With GovernmentContracts, you can:
...Follow Install Well Pump Active Contract Opportunity Notice ID 1232SA26Q1413 Related Notice...) for ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 9/10/2026
...) Status: Open Solicitation Number: IFB 8600 DCG1032REBID Description: Well Maintenance for Swimming... ...
City of Austin
Bid Due: 9/24/2026
...WELL COLLECTOR LINE REPLACEMENT) Issue Date & Time 8/9/2026 08:00:00 AM (MT) Close ...
El Paso Water
Bid Due: 9/02/2026
...Bid Number Bid Title Bid Type Organization Bid Issue Date Bid Close Date ...
City of Beaumont
Bid Due: 9/03/2026