| Location: | South Carolina |
|---|---|
| Posted: | Jan 16, 2026 |
| Due: | Feb 12, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | P24-6105-CB |
| Publication URL: | To access bid details, please log in. |
Replacement of existing timber bridge with a precast prestressed concrete bridge with prestressed concrete pile; concrete abutment and stainless steel guardrail. Restore approach roadway by removing existing soil and fill with structural compact soil. Install temporary bridge.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Grand Strand Water... & ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/29/2026
...: manager@e2ofsc.com Telephone: 843-374-8030 Description: Construction of a 100,000-gallon steel... Construction Cost Range: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...: Columbia Project Delivery Method: Design-Bid-Build Construction Cost Range: n/a Prime Contractor..." guidelines ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/16/2026