| Location: | South Carolina |
|---|---|
| Posted: | Oct 7, 2025 |
| Due: | Oct 30, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | P24-6118-SG |
| Publication URL: | To access bid details, please log in. |
Removal and disposal of existing underground storage tanks (UST), associated piping, backfilling and compacting the excavation area. Constructing a new reinforced concrete tank pad with a secondary containment curb and protection bollards, installing two above-ground storage tanks and all associated pump, hose, values and supports. Additionally, the contractor will ensure all removal and all new construction is compliant with SCDES and USEPA regulations.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Jamie Caggiano Email... Be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026