| Location: | Georgia |
|---|---|
| Posted: | Jan 31, 2025 |
| Due: | Mar 11, 2025 |
| Agency: | State Government of Georgia |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PE-60750-NONST-2025-000000007 |
| Publication URL: | To access bid details, please log in. |
| Event ID | Event Title | Government Entity | Start Date (ET) | End Date (ET) |
| PE-60750-NONST-2025-000000007 | Quarry Water Supply Project | Winder, City Of |
Jan 31, 2025 @ 09:17 AM
|
Mar 11, 2025 @ 02:00 PM
|
Start Date: Jan 31, 2025 @ 09:17 AM ET
End Date:
Mar 11, 2025 @ 02:00 PM ET
The work shall consist of furnishing all products and performing all labor necessary to perform the work shown on the plans and described in the specifications generally described as follows: 100-foot long, 8-foot wide tunnel, tunnel shotcrete and stabilizaition, 180-foot deep, 15-foot diameter shaft, low level raw water pump replacing four (4) air release valves on the raw water main, station including 4 vertical turbine pumps, transfer raw water pump station including 4 vertical turbine pumps, 15,000 gallon wet well, grading, and the gravel road. Pump stations shall be complete with instrumentation and controls, mechanical and air burst system. Erosion control, pit dewatering, and site access maintenance shall also be included.
| Code | Description |
| 91355 | Construction, Tunnel |
| 91360 | Construction, Water System, Plants, Main and Service Line |
Horace Gee
horace.gee@cityofwinder.com
7708677978

With GovernmentContracts, you can: