ADVERTISEMENT FOR BIDS
Sealed proposals will be received in the Office of the Procurement Manager, Greenville
Utilities Commission, 401 S. Greene Street, Greenville, North Carolina 27834 until 2:00 pm
(EDT) on May 28, 2026 and immediately thereafter publicly opened and read for the furnishing
of Galvanized Tubular Steel Structures AMI Monopole.
Instructions for submitting bids and complete specifications will be available in the
Office of the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina during regular office hours, which are 8:30AM – 5:00PM Monday
through Friday.
Greenville Utilities Commission reserves the right to reject any or all bids. Late bids
will not be considered.
SECTION I
GENERAL INSTRUCTIONS FOR FORMAL BIDS
RELATED TO THE PURCHASE OF APPARATUS, SUPPLIES,
MATERIALS, AND EQUIPMENT
1. NOTICE TO BIDDERS
Sealed bids, subject to the conditions made a part hereof, will be received in the Office of
the Procurement Manager, Greenville Utilities Commission, 401 S. Greene Street,
Greenville, North Carolina 27834 until 2:00 pm (EDT) on May 28, 2026, the day of
opening. Bids submitted in a fax or e-mail in response to this Invitation for Bids will not
be acceptable.
2. STANDARD FORMS REQUIRED
Each bidder must submit a proposal on the enclosed bid forms. The bid must be signed
by an authorized official of the firm. Return only the attached Proposal Form. Do
not return the Advertisement for Bids, Instructions to Bidders or Specifications.
3. PREPARATION OF BID
Bids must be in sealed envelopes clearly marked on the outside with the name of the bid
and the bid opening date and time. Bid shall be addressed to PROCUREMENT
MANAGER, GREENVILLE UTILITIES COMMISSION, 401 S. GREENE STREET,
GREENVILLE, NORTH CAROLINA 27834.
4. TIME FOR OPENING BIDS
Bids will be opened promptly and read at the hour and on the date set forth in the
advertisement in the Office of the Procurement Manager, Greenville Utilities Main Office,
401 S. Greene Street, Greenville, North Carolina. Bidders or their authorized agents are
invited to be present.
5. BID SECURITY
Each Proposal shall be accompanied by cash, cashier's check, or certified check drawn on
a bank insured with the Federal Deposit Insurance Corporation or the Savings Association
Insurance Fund, payable to the Owner, in an amount not less than five percent (5%) of the
total bid as a guarantee that a Purchase Order, if awarded, will be accepted. In lieu thereof,
an Original Bid Bond may be submitted by the Bidder in an amount not less than five
percent (5%) of the total bid.
6. NC SALES TAX
Do not include NC sales taxes in bid figure; however, Greenville Utilities Commission
(GUC) does pay sales tax. Sales tax should be added to the invoice as a separate item.
7. FEDERAL EXCISE TAX
GUC is exempt from Federal Excise Tax and will issue a Federal Exemption Certificate
upon request to the successful bidder.
8. EXCEPTIONS TO BE CLEARLY STATED
If bid is not in strict accordance with Section II, “Specifications,” bidder must list or note
all exceptions on the Request for Proposal Form, otherwise, it is fully understood that
the successful bidder will furnish equipment and/or materials exactly as specified. GUC
reserves the right to accept or reject bids with noted minor deviations from specifications
and to determine the lowest responsible, responsive bid from the standpoint of quality,
performance, and price.
9. EVALUATION AND AWARD OF BIDS
GUC reserves the right to reject any and all bids, to waive any and all informalities, and to
disregard all nonconforming or conditional bids or counter proposals. In evaluating bids,
GUC shall consider whether the bids comply with the prescribed requirements, plus all
alternates or options requested. Delivery and price per pound of steel are the primary
determinants in the evaluation of all bids. References will also be used in the evaluation
process. GUC reserves the right to include or exclude any option or alternative in GUC’s
opinion is in GUC’s best interests. If a bid is to be awarded, it will be awarded to the
lowest responsible, responsive bidder whose evaluation by GUC indicates that the award
will be in GUC’s best interests. Only firm prices will be considered for award of this bid.
10. PROMPT PAYMENT DISCOUNTS
Bidders are urged to compute all discounts into the price offered. If a prompt payment
discount is offered, it may be considered in the award of the contract.
11. NUMERICAL ERRORS
In the case of a discrepancy between a unit price and the extension (the unit price
multiplied by the number of units), the unit price governs. In the case where numerical
bids are stated both in numbers and in words, the words govern.
12. BID WITHDRAWAL
A bidder must notify GUC in writing of its request to withdraw a bid within seventy-two
(72) hours after the bid opening, not including Saturdays, Sundays, or holidays. In order
to justify withdrawal, the bidder must demonstrate that a substantial error exists and that
the bid was submitted in good faith.
13. MINORITY BUSINESS PARTICIPATION PROGRAM
GUC has adopted an Affirmative Action and Minority and Women Business Enterprise
Plan (M/WBE) Program. Firms submitting a proposal are attesting that they also have
taken affirmative action to ensure equality of opportunity in all aspects of employment,
and to utilize M/WBE suppliers of materials and/or labor.
14. DELIVERY TIME
Delivery time is to be stated and will be considered in the evaluation of bids. Failure by
the successful bidder to meet quoted delivery shall be interpreted as non-compliance with
these specifications and may be deemed sufficient cause for removal of the manufacturer
and/or distributor from our lists as acceptable manufacturers or bidders.
15. DELIVERY
Shipments will be made only upon individual releases from a blanket purchase order
issued by GUC in accordance with GUC’s current needs. Time is of the essence with
respect to all deliveries under this Agreement. Delivery of all equipment, materials, or
supplies shall be made Free on Board (FOB) GUC Warehouse, 701 Utility Way,
Greenville, North Carolina 27834, unless otherwise specified. Transport by rail or
truck are the only acceptable delivery methods from the factory to GUC. The agreed
price for such equipment, materials, or supplies shall include all costs of delivery and
ownership, and risks of loss shall not be transferred from Provider to GUC until express
written acceptance of delivery and inspection by GUC. Delivery hours are between 8:00
AM and 4:30 PM Tuesday-Thursday only. GUC’s purchase order number is to be
shown on the packing slip or any related documents. GUC reserves the right to refuse
or return any delivery with no purchase order number or which is damaged. GUC will not
be charged a restocking fee for any delivery which is refused or returned.
16. CONTRACT PERIOD
NA
17. MANUFACTURER
Bidder is to specify the manufacturer of items being quoted if applicable.
18. QUANTITIES
Quantities specified are only estimates of GUC’s requirements. GUC reserves the right to
purchase more or less than the stated quantities at prices indicated in the submitted
Proposal Form based on our actual needs.
19. LIQUIDATED DAMAGES
Time is of the essence, and it is critical that materials are delivered on schedule and time is
allowed for the completion of the work in the Contract Agreement included herewith.
Damages for delay shall be at the rate of Four Thousand dollars ($4,000.00) per calendar
day for failure of the Manufacturer to deliver all materials within the timeframe specified in
the Manufacturer’s Bid. No credit shall be given for early completion of the work.
20. CONTACT INFORMATION
Questions regarding this bid request should be directed to Cleve Haddock, Lifetime
CLGPO, Procurement Manager, at (252) 551-1533, haddocgc@guc.com. All questions
regarding this bid must be received by or before 5:00 pm (EDT) on May 12, 2026.
21. TERMS AND CONDITIONS
The attached Terms and Conditions apply to all purchases made by Greenville
Utilities Commission (GUC) and must be considered as part of the bid proposal.
[Balance of page left blank intentionally]
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.