Holmes Hospital Renovation

Location: Ohio
Posted: Apr 1, 2026
Due: Apr 21, 2026
Agency: Ohio Facility Construction Commission
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: UCN - 25181B
Publication URL: To access bid details, please log in.
Publish Date Due Date Number Owner Contractring Authority Project Name Primary Service Estimated Project Cost Q&A Short List Notes
2026/03/20 2026/04/21 UCN - 25181B University of Cincinnati Local Higher Education Holmes Hospital Renovation C-A/E $105,000,000 Q&A TBD

Attachment Preview

Request for Qualifications (Criteria Architect/Engineer*)
State of Ohio Standard Forms and Documents
Administration of Project: Local Higher Education
Project Name Holmes Hospital Renovation Response Deadline 04/21/26 2:00 pm local time
200 Albert Sabin Way, Cincinnati, OH
Project Location 45220 Project Number UCN - 25181B
City / County Cincinnati / Hamilton Project Manager Justin Jones
Owner University of Cincinnati Contracting Authority Local Higher Education
Delivery Method Design-Build Prevailing Wages State
No. of paper copies requested (stapled, not bound) 0 No. of electronic copies requested (PDF) 1
*Criteria Architect/Engineer includes "any architect holding a certificate issued under section 4703.10 of the Revised Code,
any landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or any engineer holding a
certificate issued under section 4733.14 of the Revised Code." (Ohio Building Code section 4101:1-2-01 Definitions)
Submit the requested number of Statements of Qualifications (Form F110-330) directly to Justin Jones at
jonesju@ucmail.uc.edu. See Section J of this RFQ for additional submittal instructions.
Submit all questions regarding this RFQ in writing to Justin Jones at jonesju@ucmail.uc.edu with the project number
included in the subject line (no phone calls please). Questions will be answered and posted to the Opportunities page on the
OFCC website at http://ofcc.ohio.gov on a regular basis until one week before the response deadline. The name of the party
submitting a question will not be included on the Q&A document.
Project Overview
A. Project Description
The University of Cincinnati is initiating the design and preconstruction phase of the Holmes Hospital Renovation as a first
step in relocating its College of Nursing. The Holmes Hospital Renovation represents a pivotal opportunity to advance the
mission of the University's academic facilities for healthcare programs. With approximately 185,000 sf distributed over
6 floors (ranging from approximately 24,500 sf to 46,500 sf per level), the building is poised to be transformed from a
legacy hospital into a modern, high-performing home for the UC College of Nursing. Opportunities with this project
include:
* A strategic repositioning of an underutilized asset into a signature academic hub for nursing education, research, and
innovation.
* A critical link within UC's academic health campus, strengthening connectivity to partner colleges, the UC Medical
Center, and the broader healthcare ecosystem.
* An opportunity to create a flexible, simulation-rich environment that supports contemporary and future models of
nursing education, interprofessional collaboration, and student success.
The scope of the project includes the following:
* Exterior site changes to improve arrival, accessibility, and campus integration and wayfinding.
* Exterior building changes to enhance performance and visual identity.
* Interior renovation and reconfiguration of Levels 1 through 6 to accommodate CoN needs, additional shared teaching
spaces for multi-college use, dining facility that will complement surrounding area food offerings for students and
faculty.
* Complete building system replacement.
* Targeted fit-out to support specialized program components, including simulation, clinical skills, teaching, research,
and administration.
* Pre-design support in verifying program, schedule, cost, and phasing options before design is fully initiated.
UC's approach is grounded in close collaboration with UC stakeholders, a disciplined validation of program and budget,
and a design vision that reflects the values of the College of Nursing and the University of Cincinnati.
Shortlisted firms will receive a copy of the project program.
F110-53-2025-OCT Publish Date: 03/20/2026 Page 1 of 4

Request for Qualifications (Criteria Architect/Engineer) continued
B. Scope of Services
Pursuant to ORC 153.694, professional design firms selected to provide C-A/E services shall not provide any A/E
of Record services for the project for which the professional design firm was selected as the C-A/E.
For projects advertised with an appropriately developed Program of Requirements ("POR"), upon award of the
Agreement, commence with Design. For projects without such a POR, upon award of the Agreement, commence by
developing the Program of Requirements.
The selected Criteria Architect/Engineer ("C-A/E"), as a portion of its required Scope of Services and prior to submitting its
proposals, will discuss and clarify with the Owner and/or the Contracting Authority, the cost breakdown of the A/E
Agreement detailed cost components to address the Owner's project requirements.
As required by the Agreement, and as properly authorized, provide the following categories of services: Concept and
Design Criteria, and Schematic Design.
Refer to the Ohio Facilities Construction Manual for additional information about the type and extent of services required
for each. A copy of the standard Agreement can be obtained at the OFCC website at https://ofcc.ohio.gov.
During the construction period, provide not less than not applicable hours (excluding travel time) on-site construction
administration services each week, including (1) attendance at progress meetings, (2) a written field report of each site
visit, (3) on-site representation comprised of the A/E and its consultant staff involved in the primary design of the project,
all having relevant and appropriate types of construction administration experience.
For purposes of completing the Relevant Project Experience Matrix in Section F of the Statement of Qualifications (Form
F110-330), below is a list of relevant scope of work requirements for this RFQ:
1. Existing Building Renovation Design - Higher Education and Healthcare
2. Building Facade Design/Existing Building Facade Rework
3. Experience with Roof Replacement Design
4. Experience with Civil Design/Engineering/Landscape Architecture
5. Experience with Structural Design/Engineering
6. Experience with Existing Building M/E/P/Utilities/Sprinkler/Fire Alarm Design
7. Experience with Higher Education & Healthcare furniture, fixtures, and equipment selection and design
8. Experience with tenant fit-outs of leased space
9. Experience with BOMA standards
10. Experience as a Criteria A/E on State Administered Design Build Projects
C. Estimated Budget / Funding D. Anticipated Schedule
State Funding: $0 Professional Services Start: 05 / 26
Other Funding: $105,000,000 Construction Notice to Proceed: 03 / 27
Construction Cost: $80,000,000 Substantial Completion of all Work: 12 / 26
Total Project Cost: $105,000,000 Professional Services Completed: 01 / 27
E. Estimated Basic Fee Range (see note below) F. EDGE Participation Goal
1.5% to 1.75% Percent of initial Total A/E Fee: 0.0%
NOTE: Basic Services include: (1) Concept and Design Criteria, (2) Best Value Selection, (3) Preconstruction, and (4) Construction and
Closeout services. The Basic Fee includes all registered design professional services and consultant services necessary for proper
completion of the Basic Services, including validation of existing conditions (but not subsurface or hidden conditions) and preparation of cost
estimates and design schedules for the project. The Estimated Basic Fee Range is calculated as a percentage of the Estimated Budget for
Construction Cost above, including the Owner's contingency. The Basic Fee excludes any Additional Services required for the project.
G. Basic Service Providers Required (see note below) H. Additional Service Providers Required
Lead Criteria A/E
Discipline: Architecture Technology Design
Secondary Kitchen Planning/Design
Disciplines: Civil Engineering
Landscape Architecture
F110-53-2025-OCT Publish Date: 03/20/2026 Page 2 of 4

Request for Qualifications (Criteria Architect/Engineer) continued
Structural Engineering
Mechanical-Electrical-Plumbing Eng.
Fire Protection Engineering
NOTE: The lead Criteria A/E shall be (1) any architect holding a certificate issued under section 4703.10 of the Revised Code, (2) any
landscape architect holding a certificate issued under section 4703.36 of the Revised Code, or (3) any engineer holding a certificate issued
under section 4733.14 of the Revised Code.
I. Evaluation Criteria for Selection
* Demonstrated ability to meet Owner's programmed project vision, scope, budget, and schedule on previous
projects.
* Previous experience compatible with the proposed project (e.g., type, size).
* Relevant past work of prospective firm's proposed consultants.
* Past performance of prospective firm and its proposed consultants.
* Qualifications and experience of individuals directly involved with the project.
* Proposer's previous experience (numbers of projects, sizes of projects) when working with its proposed
consultants.
* Specification writing credentials and experience.
* Proximity of prospective firms to the project site.
* Proposer's apparent resources and capacity to meet the needs of this project.
J. Submittal Instructions
Firms are required to submit the current version of Statement of Qualifications (Form F110-330) available via the OFCC
website at https://ofcc.ohio.gov.
Electronic submittals, if requested, should be combined into one PDF file named with the project number listed on the
RFQ and your firm's name, followed by "SOQ". Use the "print" feature of Adobe Acrobat or similar software for creating a
PDF rather than using a scanner. If possible, please reduce the file size of the PDF. In Acrobat, go to Advanced, then
PDF Optimizer. Electronic submittals are limited to a maximum file size of 25 MB.
Paper copies of the Statement of Qualifications, if requested, should be stapled only. Do not use special bindings or
coverings of any type. Cover letters and transmittals are not necessary.
CD/DVD copies of the Statement of Qualifications, if requested, should have the sleeve labeled with the project number
and firm name, followed by "SOQ".
Facsimile copies of the Statement of Qualifications will not be accepted.
Firms are requested to identify professional registrations, memberships and credentials including: LEED GA, LEED AP,
LEED AP+, CCCA, CCM, CCS, CDT, CPE, DBIA, and any other appropriate design and construction industry credentials.
Identify that information on the resume page for individual in Block 22, Section E of the F110-330 form.
F110-53-2025-OCT Publish Date: 03/20/2026 Page 3 of 4

Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
a. Proximity of firm to project site Less than 100 miles 5
100 miles to 150 miles 2
More than 150 miles 0
b. Amount of fees awarded by Contracting Authority in previous 24 months Less than $1,000,000 2
$1,000,000 to $5,000,000 1
More than $5,000,000 0
c. Number of licensed professionals Less than 4 professionals 0 Max = 3
4 to 10 professionals 1
More than 10 professionals 3
2. Primary Firm Qualifications (Maximum 30 points)
a. Project management lead Experience / ability of project manager to manage scope / budget / schedule / quality 0 - 10
b. Project criteria design lead Experience / creativity of project designer to achieve owner's vision and requirements 0 - 10
c. Technical staff Experience / ability of technical staff to create accurate and complete design criteria 0 - 10
3. Key Consultant Qualifications (Maximum 20 points)
a. Key discipline leads Experience / ability of key consultants to perform effectively and collaboratively 0 - 15
b. Proposed EDGE-certified Consultant participation* One point for every 2 percent increase in 0 - 5
professional services over the EDGE
participation goal
4. Overall Team Qualifications (Maximum 10 points)
a. Previous team collaboration Less than 2 sample projects 0
2 to 6 sample projects 2
More than 6 sample projects 5
b. Team organization Clarity of responsibility / communication demonstrated by table of organization 0 - 5
5. Overall Team Experience (Maximum 30 points)
a. Previous team performance Past performance as indicated by evaluations and letters of reference 0 - 10
b. Experience with similar projects / delivery method Less than 3 projects 0 - 3
3 to 6 projects 4 - 6
More than 6 projects 7 - 10
c. Budget and schedule management Performance in completing projects within original construction budget and schedule 0 - 5
d. Knowledge of Ohio Capital Improvements process Less than 3 projects 0 - 1
3 to 6 projects 2 - 3
More than 6 projects 4 - 5
Subtotal

Criteria Architect/Engineer Selection Rating Form
State of Ohio Standard Forms and Documents
Project Name Holmes Hosp Nursing Reno Proposer Firm
Project Number 25181B City, State, Zip
Selection Criteria Value Score
1. Primary Firm Location, Workload and Size (Maximum 10 points)
Less than 100 miles 5
a. Proximity of firm to project site 100 miles to 150 miles 2
More than 150 miles 0
Less than $1,000,000 2
b. Amount of fees awarded by Contracting Authority in
$1,000,000 to $5,000,000 1
previous 24 months
More than $5,000,000 0
Less than 4 professionals 0
Max
c. Number of licensed professionals 4 to 10 professionals 1
= 3
More than 10 professionals 3
2. Primary Firm Qualifications (Maximum 30 points)
Experience / ability of project manager to
a. Project management lead 0 - 10
manage scope / budget / schedule / quality
Experience / creativity of project designer to
b. Project criteria design lead 0 - 10
achieve owner's vision and requirements
Experience / ability of technical staff to create
c. Technical staff 0 - 10
accurate and complete design criteria
3. Key Consultant Qualifications (Maximum 20 points)
Experience / ability of key consultants to
a. Key discipline leads 0 - 15
perform effectively and collaboratively
One point for every 2 percent increase in
b. Proposed EDGE-certified Consultant participation* professional services over the EDGE 0 - 5
participation goal
4. Overall Team Qualifications (Maximum 10 points)
Less than 2 sample projects 0
a. Previous team collaboration 2 to 6 sample projects 2
More than 6 sample projects 5
Clarity of responsibility / communication
b. Team organization 0 - 5
demonstrated by table of organization
5. Overall Team Experience (Maximum 30 points)
Past performance as indicated by
a. Previous team performance 0 - 10
evaluations and letters of reference
Less than 3 projects 0 - 3
b. Experience with similar projects / delivery method 3 to 6 projects 4 - 6
More than 6 projects 7 - 10
Performance in completing projects within
c. Budget and schedule management 0 - 5
original construction budget and schedule
Less than 3 projects 0 - 1
d. Knowledge of Ohio Capital Improvements process 3 to 6 projects 2 - 3
More than 6 projects 4 - 5
*Must be comprised of registered professional design consulting firms and NOT the lead firm - For more
Subtotal
information on scoring this and other criteria refer to Document F199-01 - PS Selection Rating Rubric.
Notes: Evaluator:
Name
Signature Date
F110-53-2025-OCT Publish Date: 03/20/2026 Page 4 of 4

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow OHARNG Tactical Vehicle Maneuver Lane Improvement at Camp James A. Garfield Joint

DEPT OF DEFENSE

Bid Due: 8/13/2026

Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/12/2026

Follow Altitude Chambers Contractor Logistics Support for 12 Chambers Active Contract Opportunity Notice

DEPT OF DEFENSE

Bid Due: 8/12/2026

Follow Novel Thermal and Power/Energy Management Architectures for Hypersonic Applications Active Contract Opportunity

DEPT OF DEFENSE

Bid Due: 8/15/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.