Intent to Sole Source - Type-C A&E Services for Construction of SFS Facility

Location: North Carolina
Posted: Nov 12, 2026
Due: Nov 27, 2026
Agency: DEPT OF DEFENSE
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: W50S87-27-C-A001
Publication URL: To access bid details, please log in.
Follow
Intent to Sole Source - Type-C A&E Services for Construction of SFS Facility
Active
Contract Opportunity
Notice ID
W50S87-27-C-A001
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
NATIONAL GUARD BUREAU
Sub Command
JFHQ USPFO NC
Sub Command 2
USPFO NC PROCUREMENT
Office
W7NS USPFO ACTIVITY NCANG 145
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • Original Published Date: Nov 12, 2026 08:50 am EST
  • Original Response Date: Nov 27, 2026 12:00 pm EST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Dec 12, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code:
  • NAICS Code:
    • 541330 - Engineering Services
  • Place of Performance:
    NC 28208
    USA
Description

The 145th Mission Support Group Contracting office in Charlotte, NC intends to issue a written request for proposal and resulting firm-fixed price sole source award to AECOM. This sole source award will be for Type “C” services for construction contract administration for the Construction of the Security Forces Building project. Type “C” services include but are not limited to documenting and providing answers to contractor’s requests for information, submittal reviews, attendance and records at progress meetings, review of lab results, preparation of as-built drawings, and multiple site visits to inspect the building during construction.





This requirement is a follow-on award to AECOM. The requirement was previously negotiated and awarded via task order W50S87-21-F-5013. That award included Type A and B services for the design of the Construction of the Security Forces Building project. Type A services included the basis of design (specifically the design intent), the development of the project concept, and associated site investigations. The Type B services included the design narrative and the development of the construction documents.





Because AECOM designed and certified the drawings and specifications and is liable for the quality of their design, it is economical and efficient to award the Type C services as a sole source follow-on contract. There is tremendous performance and liability risk associated with another A-E firm taking over the Type C services for a project that was designed by a different firm. Having the original designer, AECOM, on contract to perform the construction phase services is necessary for the Government to ensure responsibility for their design, including ensuring the design is constructible, maintainable and operable, that the project documentation is clear, sufficiently detailed, accurate and coordinated, and contains minimal errors.





An award to a new A-E other than AECOM would increase the risk associated with these issues and potentially affect the Government’s rights under FAR 52.236-23, Responsibility of the Architect-Engineer Contractor, if another A-E were to represent or attempt to revise the current drawings and/or specifications. This clause states that the “Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished by the Contractor”. However, if a new A-E were to make recommendations during the Type C services to revise or deviate from the original drawings or specifications, any liability resulting from those changes could not be attributed to the original A-E. This could potentially create a dangerous and complicated scenario if the Government needed to hold the responsible A-E party liable for any errors or deficiencies in the designs, drawings, and/or specifications.





This action is being taken using the authority of 10 U.S.C. 2304(c)(1), as implemented by RFO 6.103-1, Only one responsible source and no other supplies or services will satisfy agency requirements.


Attachments/Links
Contact Information
Contracting Office Address
  • KO FOR NCANG DO NOT DELETE 4930 MINUTE MAN WAY
  • CHARLOTTE , NC 28208-3866
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Nov 12, 2026 08:50 am ESTSpecial Notice (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active

VETERANS AFFAIRS, DEPARTMENT OF

Bid Due: 12/09/2026

Solicitation Number: 274-ES 2023-05R-3 Project Title: Wake BRT New Bern Avenue Construction Package

State Government of North Carolina

Bid Due: 11/16/2026

CM@R-Public Safety Answering Point (PSAP) 911 Call Center Reference number: COF1517015 Closing date

City of Fayetteville

Bid Due: 11/17/2026

Solicitation Number: 322-MAINT092926 Project Title: RFB FOR PARKING LOT PATCHING, SEALCOATING, AND RESTRIPING

State Government of North Carolina

Bid Due: 12/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.