| Location: | Georgia |
|---|---|
| Posted: | Aug 20, 2025 |
| Due: | Sep 17, 2025 |
| Agency: | Winder city |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Earthen Dam Renovation - Winder Water Reservoir (aka City Pond Dam)
Request for Quotation
City of Winder, Georgia (Owner) is requesting Quotes for the Construction of the following Project:
City of Winder Earthen Dam Renovation of Winder Reservoir Dam (aka City Pond Dam)
Project Overview:
The City of Winder is soliciting quotations from qualified contractors for the repair of an existing
concrete spillway structure. The intent of the project is to address known and visible deficiencies in
the concrete spillway, while also providing flexibility for the Engineer to identify and direct the repair of
additional issues that may be discovered during a full on-site inspection.
The work includes phased repairs that maintain normal pool levels and ensure the spillway remains
operational outside of the immediate work areas. The contractor will be required to utilize appropriate
water diversion methods (e.g., cofferdams, sandbags, or steel sheet piles) to keep active repair zones
dry without draining the facility beyond its normal pool.
Scope of repair work includes, but is not limited to:
• Removal of Water Within Work Area: Diversion within spillway throughout construction.
• Chute Spalling Repair: Saw cutting, surface preparation, primer, and surface face repair per
plans.
• Chute Crack Repair: Crack repair with sealant and epoxy injection/ elastic product per plans.
• Chute Joint Repair: Saw cut where necessary. Apply sealant in joints per plans.
• Quality Control and Inspection: The Engineer shall conduct detailed inspections prior to and
after product application to confirm compliance. All repairs must be completed according to
manufacturer guidelines and to the satisfaction of the Engineer.
The Project has an expected duration of 30 days.
Please use the link below to access the Bidding Documents:
City Pond Dam Renovation_Request for Quote_Issued 8-20-25
On-site Pre-Quote Meeting:
Attendance is optional and not mandatory.
Date: Wednesday, September 3, 2025
Time: 2:00pm local time
Location: 746 City Pond Road, Winder, GA 30680 (The dam is located on City Pond Park property).
Instructions to Bidders:
For all further requirements regarding quote submittal, qualifications, procedures, and contract
award, refer to the Instructions to Bidders that are included in the Bidding Documents.

With GovernmentContracts, you can:
...of 8-inch ceramic epoxy lined ductile iron pipe (DIP) at the lift station ...
State Government of Georgia
Bid Due: 7/02/2026
...and valves, and associated controls. 3. Approximately 20 linear feet of 8-inch ceramic ...
Forsyth County
Bid Due: 7/02/2026