| Location: | Texas |
|---|---|
| Posted: | Feb 11, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0125 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the (approximate) following: Reconstruction of the existing two-lane Bonds Ranch Road to a four-lane divided neighborhood connector. This project includes intersection improvements with traffic signals at Wagley Robertson Road and Fossil Springs Drive, and the extension of Wagley Robertson Road north of Bonds Ranch Road. Approximately 5800 LF of proposed storm drain, 750 LF of 16” and 36” proposed water line, and 350 LF of 12” proposed sanitary sewer will be installed. Major drainage channel grading is included at the drainage outfalls. The project also includes street lighting, pavement markings, signing, and utility adjustments throughout the corridor.

With GovernmentContracts, you can:
...Project: CONNECTOR W / ENVIRO KIT | 2100257 Ref. #: 2100257 Type: RFQ ...
Dallas Area Rapid Transit
Bid Due: 7/31/2026
...-09-30 (Plano East Senior High School Phase 2 Connector 3) Issue Date & ...
Plano Independent School District
Bid Due: 8/04/2026
...to provide Professional Engineering Services for the Hardy Downtown Connector (HDC) Program. HCTRA...
Harris County
Bid Due: 8/10/2026
...to provide Professional Engineering Services for the Hardy Downtown Connector (HDC) Program. HCTRA...
Harris County
Bid Due: 8/17/2026