| Location: | Texas |
|---|---|
| Posted: | Feb 11, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0125 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the (approximate) following: Reconstruction of the existing two-lane Bonds Ranch Road to a four-lane divided neighborhood connector. This project includes intersection improvements with traffic signals at Wagley Robertson Road and Fossil Springs Drive, and the extension of Wagley Robertson Road north of Bonds Ranch Road. Approximately 5800 LF of proposed storm drain, 750 LF of 16” and 36” proposed water line, and 350 LF of 12” proposed sanitary sewer will be installed. Major drainage channel grading is included at the drainage outfalls. The project also includes street lighting, pavement markings, signing, and utility adjustments throughout the corridor.

With GovernmentContracts, you can:
...gallons per day (MGD) Mary's Creek Water Reclamation Facility (MCWRF) located at 11091 ...
City of Fort Worth
Bid Due: 6/25/2026