| Location: | Texas |
|---|---|
| Posted: | Feb 11, 2026 |
| Due: | Mar 19, 2026 |
| Agency: | City of Fort Worth |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-0125 |
| Publication URL: | To access bid details, please log in. |
Project Description: The major work will consist of the (approximate) following: Reconstruction of the existing two-lane Bonds Ranch Road to a four-lane divided neighborhood connector. This project includes intersection improvements with traffic signals at Wagley Robertson Road and Fossil Springs Drive, and the extension of Wagley Robertson Road north of Bonds Ranch Road. Approximately 5800 LF of proposed storm drain, 750 LF of 16” and 36” proposed water line, and 350 LF of 12” proposed sanitary sewer will be installed. Major drainage channel grading is included at the drainage outfalls. The project also includes street lighting, pavement markings, signing, and utility adjustments throughout the corridor.

With GovernmentContracts, you can:
...: Backfill Services, Digging, Ditching, Road Grading, Rock Stabilization, etc. Qty Unit Cost ...
North Texas Tollway Authority
Bid Due: 11/19/2026
...-Erosion Control Services; 98832-Grading (Of Parking Lots, Etc. - Not Road Building); 98852-Landscaping...; ...
State Government of Texas
Bid Due: 12/01/2026
...Services; 91223-Construction, General (Backfill Services, Digging, Ditching, Road Grading, Rock...
State Government of Texas
Bid Due: 11/24/2026
...includes removal of existing concrete and bituminous pavements, portions of the vehicle service ...
City of McAllen
Bid Due: 12/17/2026