| Location: | North Carolina |
|---|---|
| Posted: | Aug 19, 2025 |
| Due: | Aug 27, 2025 |
| Agency: | City of Charlotte |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 269-2026-119 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will construct an emergency vehicle traffic signal with a fiber connect to the City of Charlotte network at the Phase 1 driveway for the Firehouse River District on Dixie River Road/ The work includes traffic signal cabinet, signal heads, messenger cable, underground conduit, aerial fiber, fiber splicing, and temporary traffic control.

With GovernmentContracts, you can:
...Practice for in Field Spray Applied Mortar Lining for Large Diameter Stormwater and ...
Town of Holly Springs
Bid Due: 7/27/2026
..., ducting, piping and conduits 7. Contractor will notify engineer immediately if an ...
State Government of North Carolina
Bid Due: 8/12/2026
...for in Field Spray Applied Mortar Lining for Large Diameter Stormwater and Sewer ...
Town of Holly Springs
Bid Due: 7/27/2026
...installation of new chargers, conduit, wire, equipment pads, switchboards, and supporting site work. ...
City of Durham
Bid Due: 8/25/2026