| Location: | Florida |
|---|---|
| Posted: | Aug 24, 2026 |
| Due: | Aug 28, 2026 |
| Agency: | AGRICULTURE, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 12639526Q0232 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
The facility located at the USDA Subtropical Horticulture Research Agricultural Research Service (ARS) Station has approximately 6,000 square feet of lab and office area. The ductwork is collecting condensation and causing water damage. The HVAC system consists of one air-cooled chiller, associated pumps, and two variable air volume air handling units. The humidity in the labs was tested and determined to be higher than the acceptable range (70% or higher). A&E firm Clark Nexsen provided retro commissioning with TAB services and proposed solutions for the condensation problem, as well as designs for the renovation of the roof, HVAC, BAS, and chiller.
Solicitation documents are posted below.
NOTE: The drawings and specifications below are the A&E's 100% submittal to USDA-APHIS. When internal reviews are complete and returned, the A&E will finalize and send us the stamped, for-construction drawings and specs, at which point they'll be posted here.
Amendment 1 and the final construction documents are posted below.
Site visit attendance list is posted below.
An RFI log is posted below.
Amendment 2 is posted below. It extends the closing date for receipt of proposals.
Amendment 3 is posted below. It corrects the NAICS code. RFIs and responses also posted.
| Jul 20, 2026 | [Combined Synopsis/Solicitation (Original)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Jul 23, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Jul 31, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Aug 4, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Aug 13, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Aug 17, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |
| Aug 25, 2026 | [Combined Synopsis/Solicitation (Updated)] Building 63 Envelope and HVAC Renovation, Coral Gables |

With GovernmentContracts, you can:
...Description: Submersible Well Pump Motors Department: Purchasing Buyer: Regenia Robinson...
Palm Beach County
Bid Due: 5/15/2030
...Project: Maintenance of Well and Water Treatment Systems Ref. #: ITB-26-00382 Type: ITB ...
Hillsborough County
Bid Due: 9/08/2026
...Project ID: 26-27 MWKlondike Title: Klondike Landfill Monitoring Well Installation Addenda: 0... Release ...
Escambia County
Bid Due: 9/16/2026
...Procurement ID: ITB 26B-003 Title: Well Construction and Aquifer Testing in Bay County ...
Northwest Florida Water Management District
Bid Due: 9/01/2026