| Location: | Wyoming |
|---|---|
| Posted: | Oct 24, 2024 |
| Due: | Oct 24, 2024 |
| Agency: | TRANSPORTATION, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | 6982AF24B000018 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
PROJECT DESCRIPTION:
In cooperation with the F.E. Warren Air Force Base and Central Federal Lands Highway Division, this project includes re-graveling up to 116.910 miles of existing gravel on Minuteman Missile Access Roads in various counties within Colorado, Nebraska, and Wyoming. The intent of this project is to provide necessary aggregate road maintenance for select routes utilized by the United States Air Force. The work includes roadway reconditioning and adding four inches of aggregate surface course. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.
SCOPE OF WORK:
With a fixed-price variable-scope contracting method, less mileage may be awarded. The total amount of miles included in the scope will be dictated by the mileage awarded. The project PS&E will provide a prioritized schedule of roadways to be improved that is anticipated to include up to 116.910 total miles of roadway reconditioning and re-graveling of existing aggregate surface roads.
THE BREAKDOWN OF THE ROADS IS:
PRINCIPAL WORK ITEMS:
Full utilization of the funding amount to provide Aggregate Surface Reconditioning and Re-Graveling Aggregate Surface Course for up to 116.910 miles of existing aggregate surface roads.
ANTICIPATED SCHEDULE:
Advertise: September 2024
Award: Fall 2024
Construction: June 2025 through September 2025
DISCLOSURE OF MAGNITUDE: $8,650,000.00
| Oct 16, 2024 | [Solicitation (Updated)] CO OMAD 300(69) Minuteman Missile Access Road |
| Oct 23, 2024 | [Solicitation (Updated)] CO OMAD 300(69) Minuteman Missile Access Road |

With GovernmentContracts, you can:
Project ID: Title: Christensen Road Settlement Bridge Approach Addenda: 0 Release Date: 5/27/2026
City of Cheyenne
Bid Due: 6/25/2026
Project ID: Title: City of Cheyenne - 2026 Various Roof Replacements Addenda: 0
City of Cheyenne
Bid Due: 6/23/2026
Follow Sewer Camera Trailer Upgrade, FE Warren AFB, WY Active Contract Opportunity Notice
DEPT OF DEFENSE
Bid Due: 6/10/2026
Project ID: Title: City of Cheyenne - 2026 Various Roof Replacements Addenda: 0
City of Cheyenne
Bid Due: 6/23/2026