| Location: | Maryland |
|---|---|
| Posted: | Dec 23, 2024 |
| Due: | Feb 4, 2025 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Work includes the following major items: Replacement of existing sewage pumps and associated piping. Replacement of existing suction and discharge isolation valves. Replacement of existing check valves. Replacement of electrical equipment indicated. Replacement of dry well ventilation system. Replacement of stairs and platform. Replacement of wet well level transducer system. Installation of a new prefabricated electrical building. Wet well protective coating application. Demolition of various equipment and materials in order to conduct new work. Bypass pumping to allow performance of the work. "See Notice to Contractors for the pre-bid meeting information" "Prevailing Wage Eligible"
Start Date: Dec 23, 2024
End Date: Feb 04, 2025
Capital Construction Request

With GovernmentContracts, you can:
...the sewage/septic screen, replacing lime conveyance system components under existing lime silo, replacing... ...
State Government of Maryland
Bid Due: 8/06/2026
...Contractors to provide replacing the sewage/septic screen, replacing lime conveyance system... components under ...
Maryland Environmental Service
Bid Due: 8/06/2026
...; and staff training. All work must maintain continuous sewage system operation and ...
JUSTICE, DEPARTMENT OF
Bid Due: 7/30/2026
...continuous sewage system operation and comply with Federal, State, Local, NEC, NFPA 820, ...
JUSTICE, DEPARTMENT OF
Bid Due: 8/13/2026