| Location: | Maryland |
|---|---|
| Posted: | Jan 6, 2025 |
| Due: | Feb 18, 2025 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Work includes the following major items: Replacement of existing sewage pumps and associated piping. Replacement of existing suction and discharge isolation valves. Replacement of existing check valves. Replacement of electrical equipment indicated on the contract drawings. Replacement of dry well ventilation system. Construction of a new electrical room inside the building. Installation of a trolley hoist. Disposal of calcium nitrate. Demolition of the calcium nitrate storage and fee system. Installation of stairs and platform. Installation of wet well level transducer system. Installation of a curbed concrete slab. Wet well protective coating application. Demolition of various equipment and materials in order to conduct new work. Bypass pumping to allow performance of the work. "See Notice to Contractors for the pre-bid meeting information" "Prevailing Wage Eligible"
Start Date: Jan 06, 2025
End Date: Feb 18, 2025
Capital Construction Request

With GovernmentContracts, you can:
...to precast structures; sewage pumps, piping and valves; flowmeter; sewage grinder; odor control... ...
Anne Arundel County
Bid Due: 7/14/2026
.../23/2026 Publish Date: 6/5/2026 1:34:45 PM Main Category: Plumbing system maintenance or repair... ...
State Government of Maryland
Bid Due: 6/23/2026
...Follow Site Effluent System Active Contract Opportunity Notice ID 1333ND26RNB190022 Related Notice... (FAR ...
COMMERCE, DEPARTMENT OF
Bid Due: 6/25/2026