| Location: | Rhode Island |
|---|---|
| Posted: | Mar 31, 2025 |
| Due: | Apr 22, 2025 |
| Agency: | Rhode Island Department of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The work encompassed in this contract shall include, but not be limited to, performing all operations and furnishing all materials, labor and equipment necessary for sweeping, cleaning, micromilling, surface preparation, spot repair, leveling, cross slope correction, application of specified bituminous hot mix asphalt (HMA) across existing bituminous pavements within the specified longitudinal and transverse limits. Also included in the work shall be wheelchair ramp reconstruction, driveway reconstruction, drainage structure reconstruction, berm replacement, maintenance and protection of traffic and public access, adjustment of all drainage structures, manholes, utility gates, and other structures, pavement markings, temporary marking delineation of each roadway or roadway segment, and all other incidentals, complete, in place and accepted, as necessary to complete the work of this contract to the satisfaction of the Department. RIC 2025-CR-021
Start Date: Mar 28, 2025
End Date: Apr 22, 2025
Dept of Transportation

With GovernmentContracts, you can:
...of drainage utilities, and remediation of lead impacted soils....
State Government of Rhode Island
Bid Due: 1/14/2027
...lighting. Site drainage, subject to the conditions of the RICRMC assent. Miscellaneous items ...
State Government of Rhode Island
Bid Due: 11/17/2026
...for F&I storm drainage infrastructure, stormwater treatment systems, potable water infrastructure...
State Government of Rhode Island
Bid Due: 12/03/2026
...controls, grading, restoration, installation of drainage utilities, and remediation of lead impacted soils...
State Government of Rhode Island
Bid Due: 1/14/2027