| Location: | Rhode Island |
|---|---|
| Posted: | Apr 30, 2025 |
| Due: | May 27, 2025 |
| Agency: | Rhode Island Department of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Rhode Island Contract No. 2025-CB-035, Federal-Aid Project No. BRO-044H(002), Re-Advertising of Bridge Group 44_H ? Nonquit Pond for the replacement of Nonquit Pond Bridge No. 292 in the Town of Tiverton will consist of, but is not limited to erosion control, relocation of existing utilities, concrete abutments, wingwalls, pile caps, steel micropiles, approach slabs, rehabilitation of existing reinforced concrete abutments and wingwalls, elastomeric bearings, prestressed concrete NEXT D beams, full depth pavement, guardrail installation, field office, mobilization, maintenance and protection of traffic, loam and seed, and all other incidentals required to finish the work of this contract, complete and accepted.
Start Date: Apr 29, 2025
End Date: May 27, 2025
Dept of Transportation

With GovernmentContracts, you can:
RFQ26006645 |DOC Threading and Embroidery Material for the Embroidery Shop The State of
State Government of Rhode Island
Bid Due: 6/11/2026
OEV26006539 |MPA 414 OE Septic and Drain Services MPA 414 Open Enrollment provides
State Government of Rhode Island
Bid Due: 7/31/2028
Bid Description RI Public Transit Authority Bid Number: 26-19 Description The Rhode Island
State Government of Rhode Island
Bid Due: 6/10/2026
26-011 Pleasant Street Public Stairway Construction Phase Addendum 1 ADDENDUM NO. 1 PUBLIC
City of Pawtucket
Bid Due: 6/25/2026