| Location: | Rhode Island |
|---|---|
| Posted: | Sep 1, 2025 |
| Due: | Sep 23, 2025 |
| Agency: | Rhode Island Department of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project area is a 1-mile-long corridor of Main Street (Route 114), from the Bristol Town line to the intersection of Main Street and Wheaton Street. The work includes mill & overlay resurfacing of the roadway pavement; replacement of existing sidewalks, driveway aprons and wheelchair ramps on both sides of the roadway; curb replacement and resetting, signal replacement at the Campbell street intersection; signing and striping improvements to enhance vehicular and pedestrian safety; and removal of existing trees (selected by arborist) and planting of new street trees. A significant portion of the existing drainage system within existing sidewalk areas will also be replaced and relocated within the roadway shoulder, along with the addition of new water quality treatment structures.
Start Date: Aug 29, 2025
End Date: Sep 23, 2025
Dept of Transportation

With GovernmentContracts, you can:
Follow Request For Information Re: Residential Reentry Services and Home Confinement Services within
JUSTICE, DEPARTMENT OF
Bid Due: 10/02/2026
OET26006798 |MPA 589 PK-12 School Redesign and Strategic Support Services The Rhode Island
State Government of Rhode Island
Bid Due: 7/07/2028
Follow Fiber Optic Cable and Accessories RI ANG Active Contract Opportunity Notice ID
DEPT OF DEFENSE
Bid Due: 8/21/2026
OET27006905 |MPA 118 OE Hazardous Waste and Petroleum Related Services MPA 118 Open
State Government of Rhode Island
Bid Due: 9/30/2028