| Location: | Rhode Island |
|---|---|
| Posted: | Sep 1, 2025 |
| Due: | Sep 23, 2025 |
| Agency: | Rhode Island Department of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project area is a 1-mile-long corridor of Main Street (Route 114), from the Bristol Town line to the intersection of Main Street and Wheaton Street. The work includes mill & overlay resurfacing of the roadway pavement; replacement of existing sidewalks, driveway aprons and wheelchair ramps on both sides of the roadway; curb replacement and resetting, signal replacement at the Campbell street intersection; signing and striping improvements to enhance vehicular and pedestrian safety; and removal of existing trees (selected by arborist) and planting of new street trees. A significant portion of the existing drainage system within existing sidewalk areas will also be replaced and relocated within the roadway shoulder, along with the addition of new water quality treatment structures.
Start Date: Aug 29, 2025
End Date: Sep 23, 2025
Dept of Transportation

With GovernmentContracts, you can:
...Treatment Facility, 427 Water Street, Warren, Rhode Island 02885 at the Town's Wastewater ...
Town of Warren
Bid Due: 10/01/2026
..., 427 Water Street, Warren, Rhode Island 02885 at the Town's Wastewater Treatment ...
State Government of Rhode Island
Bid Due: 10/01/2026
...REQUEST FOR PROPOSALS Warren Wastewater Treatment Facility MCC Room HVAC System Town of ...
Town of Warren
Bid Due: 10/01/2026
..., serving the MCC Room at the Town's Wastewater Treatment Plant located at ...
State Government of Rhode Island
Bid Due: 10/01/2026