| Location: | Rhode Island |
|---|---|
| Posted: | Sep 1, 2025 |
| Due: | Sep 23, 2025 |
| Agency: | Rhode Island Department of Transportation |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The project area is a 1-mile-long corridor of Main Street (Route 114), from the Bristol Town line to the intersection of Main Street and Wheaton Street. The work includes mill & overlay resurfacing of the roadway pavement; replacement of existing sidewalks, driveway aprons and wheelchair ramps on both sides of the roadway; curb replacement and resetting, signal replacement at the Campbell street intersection; signing and striping improvements to enhance vehicular and pedestrian safety; and removal of existing trees (selected by arborist) and planting of new street trees. A significant portion of the existing drainage system within existing sidewalk areas will also be replaced and relocated within the roadway shoulder, along with the addition of new water quality treatment structures.
Start Date: Aug 29, 2025
End Date: Sep 23, 2025
Dept of Transportation

With GovernmentContracts, you can:
...Contact Phone 11/04/2026 2:00 pm 710.00C Active(Scheduled) Lincoln Septage Facility Improvements... Quasi-Public Narragansett ...
State Government of Rhode Island
Bid Due: 11/04/2026
...Tunnel System Improvements Quasi-Public Narragansett Bay Water Quality District Commission mcaruolo...@narrabay.com 401-461-8848 Bid ...
State Government of Rhode Island
Bid Due: 10/13/2026
...Islanders have access to high-quality, cutting-edge career development services, the selected... feedback. 2. ...
State Government of Rhode Island
Bid Due: 9/28/2026
...by improving their quality of life, increasing self-sufficiency, and improving health outcomes. Funds..., ...
Rihousing
Bid Due: 10/13/2026