| Location: | Maryland |
|---|---|
| Posted: | Oct 14, 2025 |
| Due: | Nov 18, 2025 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Work includes the following major items: ? Replacement of existing sewage pumps.? Replacement of existing suction and discharge isolation valves.? Replacement of existing check valves. ? Replacement of existing surge relief and air valves on the pump discharge header.? Replacement of existing valves in the Emergency Connection Vault. ? Demolition of existing electrical equipment and wiring.? Construction of new electrical building.? Replacement of electrical equipment and wiring in a new Electrical Building.? Replacement of existing roof.? Replacement of dry well ventilation system to comply with current County standards and NFPA 820 requirements.? Demolition of two soil filters.? Installation of a wet well odor control ventilation system and an emergency storage tank odor control system.? Installation of wet well level transducer system.? "See Notice to Contractors for the prebid meeting information" "Prevailing Wage Eligible"
Start Date: Oct 13, 2025
End Date: Nov 18, 2025
Capital Construction Request

With GovernmentContracts, you can:
...Abstract Negotiation Number 87582 Negotiation Type Auction Title Mill Branch WWPS HVAC & ...
Washington Suburban Sanitary Commission
Bid Due: 1/01/2027
...to precast structures; sewage pumps, piping and valves; flowmeter; sewage grinder; odor control... ...
Anne Arundel County
Bid Due: 7/14/2026