| Location: | Maryland |
|---|---|
| Posted: | Jan 5, 2026 |
| Due: | Feb 10, 2026 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The installation of approximately 4,000 LF of 4-inch high-density polyethylene (HDPE) force main (FM) and approximately 900 LF of 6-inch HDPE FM. The proposed pipe alignment begins at the Shoreham Beach I Sewage Pumping Station (SPS), traverses along Dogwood Trail, Cedar Lane and Shoreham Beach Road before terminating in a new precast concrete manhole located along Shoreham Beach Road on the Triton Beach SPS property. In addition to the pipe installation, "See Notice to Contractor for the prebid meeting information" "Prevailing Wage Eligible"
Start Date: Jan 05, 2026
End Date: Feb 10, 2026
Capital Construction Request

With GovernmentContracts, you can:
...Date: 5/27/2026 10:01:20 AM Main Category: Sludge or sewage removal equipment Solicitation Type: ...
State Government of Maryland
Bid Due: 6/29/2026
...to precast structures; sewage pumps, piping and valves; flowmeter; sewage grinder; odor control...
Anne Arundel County
Bid Due: 7/14/2026
...for Bid (w/ Min Quals) Main Category Sewage pumps Issuing Agency State Highway ...
State Government of Maryland
Bid Due: 6/23/2026
...(FAR 19.15) Product Service Code: Z1ND - MAINTENANCE OF SEWAGE AND WASTE FACILITIES ...
COMMERCE, DEPARTMENT OF
Bid Due: 6/25/2026