| Location: | Maryland |
|---|---|
| Posted: | Jan 5, 2026 |
| Due: | Feb 10, 2026 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The installation of approximately 4,000 LF of 4-inch high-density polyethylene (HDPE) force main (FM) and approximately 900 LF of 6-inch HDPE FM. The proposed pipe alignment begins at the Shoreham Beach I Sewage Pumping Station (SPS), traverses along Dogwood Trail, Cedar Lane and Shoreham Beach Road before terminating in a new precast concrete manhole located along Shoreham Beach Road on the Triton Beach SPS property. In addition to the pipe installation, "See Notice to Contractor for the prebid meeting information" "Prevailing Wage Eligible"
Start Date: Jan 05, 2026
End Date: Feb 10, 2026
Capital Construction Request

With GovernmentContracts, you can:
...provides the replacement and upgrade of the Anacostia II Wastewater Pumping Station Electrical ...
State Government of Maryland
Bid Due: 7/15/2026
...AND HAND PUMPS NAICS Code: 333914 - Measuring, Dispensing, and Other Pumping Equipment ...
HOMELAND SECURITY, DEPARTMENT OF
Bid Due: 6/19/2026
..., Maryland. The successful contractor(s) will be responsible for scheduled septic pumping at ...
Charles County
Bid Due: 6/25/2026