| Location: | Maryland |
|---|---|
| Posted: | Feb 10, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Work includes the following major items: Replacement of existing sewage pumps and associated piping. Replacement of existing suction and discharge isolation valves. Replacement of existing check valves. Replacement of electrical equipment indicated on the contract drawings. Replacement of dry well ventilation system to comply with current County standards and NFPA 820 requirements. Installation of wet well level transducer system. Wet well protective coating application. Demolition of various equipment and materials in order to conduct new work. Bypass pumping to allow performance of the work. "See Notice to Contractors for the pre-bid meeting information" "Prevailing Wage Eligible"
Start Date: Feb 09, 2026
End Date: Mar 24, 2026
Capital Construction Request

With GovernmentContracts, you can:
Request for Proposals - Testing and Inspection Services Baltimore Polytechnic Institute and Western
Maryland Stadium Authority
Bid Due: 8/06/2026
Follow Next Generation Command and Control (NGC2) - Commercial Solutions Opening (CSO) Active
DEPT OF DEFENSE
Bid Due: 5/16/2027
Follow Existing Illumina sequencing Infrastructure Active Contract Opportunity Notice ID PCA-NIAMS-08113 Related Notice
HEALTH AND HUMAN SERVICES, DEPARTMENT OF
Bid Due: 7/30/2026
Follow NOTICE OF INTENT TO SOLE SOURCE: One (1) Chemical Vapor Deposition (CVD)
DEPT OF DEFENSE
Bid Due: 7/28/2026