| Location: | Maryland |
|---|---|
| Posted: | Feb 10, 2026 |
| Due: | Mar 24, 2026 |
| Agency: | Anne Arundel County |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The Work includes the following major items: Replacement of existing sewage pumps and associated piping. Replacement of existing suction and discharge isolation valves. Replacement of existing check valves. Replacement of electrical equipment indicated on the contract drawings. Replacement of dry well ventilation system to comply with current County standards and NFPA 820 requirements. Installation of wet well level transducer system. Wet well protective coating application. Demolition of various equipment and materials in order to conduct new work. Bypass pumping to allow performance of the work. "See Notice to Contractors for the pre-bid meeting information" "Prevailing Wage Eligible"
Start Date: Feb 09, 2026
End Date: Mar 24, 2026
Capital Construction Request

With GovernmentContracts, you can:
...ID: BPM057228 Title: Generator and electrical Equipment Replacement at two schools Status: Open... ...
State Government of Maryland
Bid Due: 6/15/2026
...ID: BPM056692 Title: BC-21512-M Dining Hall 13kV Switch Replacement IFB Status: Open Due ...
State Government of Maryland
Bid Due: 6/16/2026
...ID: BPM057079 Title: Maryland Correctional Pre-Release System: 50kv Generator Replacement Status... Division Solicitation ...
State Government of Maryland
Bid Due: 6/16/2026
...provides the replacement and upgrade of the Anacostia II Wastewater Pumping Station Electrical ...
State Government of Maryland
Bid Due: 7/15/2026