| Location: | Iowa |
|---|---|
| Posted: | Apr 6, 2026 |
| Due: | Apr 28, 2026 |
| Agency: | University of Iowa Facilities Management |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
1177201 - Library - Library - Correct Structural Deficiencies in Deck Above Loading Dock
| Project #: | 1177201 |
| Scope: | This project will utilize a structural study that was conducted in September of 2025 to repair some "T" beam supports within the Library loading dock area. |
| Building: | Library |
| Project Status: | Design |
| Project Manager: | Trevor Watkinson trevor-watkinson@uiowa.edu |
| Estimated Construction Cost: | $385,000.00 |
| Pre Bid Date: | 4/15/26 |
| Pre Bid Location: | Library Conf. Rm. LIB2032: 11AM |
| Bid Date: | 4/28/26 |
| Awarded To: | |
| Construction Start: | |
| Construction Finish: |

With GovernmentContracts, you can:
...will include experienced Architectural, Structural, Mechanical, Electrical, and Fire Protection design... 23), is ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026
..., Structural, Mechanical, Electrical, and Fire Protection design professionals. All architects...-Phase solicitation for ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/18/2026