| Location: | New York |
|---|---|
| Posted: | Jun 28, 2026 |
| Due: | Aug 4, 2026 |
| Agency: | City of Rochester |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
RFP: Rundel Memorial Library Comprehensive Master Plan, Mechanical Improvements
Project No. 25013
The City of Rochester, through its Bureau of Architecture and Engineering, is soliciting proposals from firms with experience inspecting and evaluating mechanical systems to develop a comprehensive master plan for mechanical improvements to the Rundel Memorial Library. The Rundel Memorial Library is an historic building in downtown Rochester built in 1936 which, along with the Bausch and Lomb Library, serves as the Central Library branch for Rochester and Monroe County. The library includes approximately 120,000 sf of public stacks, exhibitions, reading spaces and meeting spaces, along with supporting storage, distribution and staff areas. The current grant-funded Rundel Library and Intake Air Upgrades Project includes surveys of existing mechanical systems and associated electrical requirements. This survey work, along with ongoing maintenance and repair requirements, highlights the need for several substantial upgrades to the existing mechanical systems. These improvements require comprehensive, planned programming based on multi-system design decisions as part of the master plan in order to implement integrated, phased, long-term solutions.
The library proper is constructed of concrete encased steel framing and faced in limestone. The building is supported on steel framing directly above the Johnson and Seymour raceway. The raceway connection to the Genesee River diverts water to a basin beneath the library. The building has a total of three floors above grade and two floors below grade (upper and lower stacks). There is a large central light court at the second floor level as well as multiple covered skylights and penthouses on the roof level.
The library currently brings outside air to the building through mechanical and natural ventilation means. A project to improve the ventilation in the library began construction in spring 2026. The building's HVAC system incorporates mechanical air handlers and boilers/chillers, including a custom-built asbestos covered air handler in the penthouse original to the building (1934). During the summer months, river water is pumped from the Johnson and Seymour raceway basin to provide cold water for the library cooling system.
The master plan will include a summary of existing conditions and equipment surveys, a matrix of solution options, recommendations, conceptual scopes of work with cost estimates and timelines. We invite you to submit a proposal demonstrating qualifications for this work.
Pre-proposal site walk-thru
A pre-proposal site walk-thru for interested consultants will be held at 10 am on Tuesday, June 30, 2026. The rallying location for the walk-thru will be the Rundel Arts Room located on the first floor of 115 South Ave, Rochester, NY 14604. Access to some mechanical equipment rooms will be via stairs.
RFP schedule and delivery information
Submit five (5) copies and one (1) electronic copy of your proposal no later than 4:00 pm on Tuesday, August 4, 2026.

With GovernmentContracts, you can:
...Architecture and Engineering, P.C. Issue date: 8/27/2026 Due date: 9/17/2026 Location: NYSDOT Region ...
The New York State Contract Reporter
Bid Due: 9/17/2026
...Program: ENGINEERING, DESIGN AND CONSTRUCTION Industry: Professional Services - Architecture.../Engineering EPIN: 82626P0028 Procurement ...
City of New York
Bid Due: 9/22/2026
...Program: Industry: Professional Services - Architecture/Engineering EPIN: 85027Y0177 Procurement...
City of New York
Bid Due: 9/29/2026
...Program: Select Bus Service Industry: Professional Services - Architecture/Engineering EPIN...:00 PM Main Commodity: ...
City of New York
Bid Due: 10/19/2026