| Location: | Rhode Island |
|---|---|
| Posted: | Aug 3, 2026 |
| Due: | Aug 28, 2026 |
| Agency: | State Government of Rhode Island |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
This project consists of 3 bridge replacements. They include Bridge No. 005051 (butted box beam), Bridge No. 005151 (concrete arch), and Bridge No. 005251 (butted box beam). All bridges are over bodies of water. The bridges were built between 1928 and 2002 with several rehabilitations performed as recently as 2019. All the bridges have a bituminous wearing surface. The bridge inspection reports, photos, utility information, and other attached documents provide additional information about the individual bridges.
Start Date: Jul 31, 2026
End Date: Aug 28, 2026
Dept of Transportation

With GovernmentContracts, you can:
...Contact Phone 11/02/2026 10:00AM IFB 25-15R Active(Scheduled) Pell Bridge Rehabilitation Quasi...-Public RI Turnpike ...
State Government of Rhode Island
Bid Due: 11/02/2026
...Contact Phone 10/19/2026 10:00AM IFB 25-15R Active(Scheduled) Pell Bridge Rehabilitation Quasi...-Public RI Turnpike ...
State Government of Rhode Island
Bid Due: 10/19/2026
...Contact Phone A 10/02/2026 10:00AM IFB 25-15 A2 Active(Scheduled) Pell Bridge Rehabilitation Quasi...-Public ...
State Government of Rhode Island
Bid Due: 10/02/2026
...Turnpike and Bridge Authority procurement@ritba.org 401-423-0800 Bid Description RI Turnpike and Bridge...
State Government of Rhode Island
Bid Due: 11/02/2026