| Location: | Rhode Island |
|---|---|
| Posted: | Sep 7, 2026 |
| Due: | Oct 1, 2026 |
| Agency: | State Government of Rhode Island |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Rhode Island College is seeking a vendor for HVAC improvements that includes the addition of air-conditioning to the gym at Rhode Island College Murray Center, located at 600 Mount Pleasant Avenue, Providence, RI. The work includes: replacement of the existing HVAC units with two new air handling units connected to dedicated outdoor condensers with architectural screening; replacement in kind of two existing air handling units, new and re-used ductwork; modification and re-use of/re-connection to the existing heating system; all associated piping, insulation, electrical components, support hardware, and all necessary controls integration required to deliver a fully functional installation to the Murray Center. Prebid - non-mandatory: Date/Time: September 17, 2026 @ 9:00 AM Location: Rhode Island College 600 Mount Pleasant Ave, Providence Forman Center Room 130 (behind Forman Center, East Campus)
Start Date: Sep 04, 2026
End Date: Oct 01, 2026
State of Rhode Island

With GovernmentContracts, you can:
..., integration, analysis, and reporting, in accordance with the terms of this Request ...
State Government of Rhode Island
Bid Due: 11/23/2026
...Follow P084 NEXT GENERATION TORPEDO INTEGRATION LAB, NAVAL STATION NEWPORT, NEWPORT RI Active.../Location: ...
DEPT OF DEFENSE
Bid Due: 11/10/2026