| Location: | Nevada |
|---|---|
| Posted: | Oct 10, 2024 |
| Due: | Oct 29, 2024 |
| Agency: | Nevada Government eMarketplace (NGEM) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25300275 (PWP CC-2025-046) |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Invitation for Bid |
| Status | Issued |
| Number | 25300275 (PWP CC-2025-046) (Tanstaafl Water Tank Rehabilitation) |
| Issue Date & Time | 10/8/2024 08:00:05 AM (PT) |
| Close Date & Time | 10/29/2024 11:00:00 AM (PT) |
| Question Cut Off Date | 10/22/2024 11:00:00 AM (PT) |
| Notes |
Tit le | Tanstaafl Water Tank Rehabilitation
Project No. |
P350523007
PWP No. | CC-2025-046
Engineer's Estimate |
$250,000
Funding | This project is locally funded.
BABAA | This project is not subject to BABAA requirements.
Type | This project is deemed
a vertical construction project.
Pre-Bid Meeting | This project
will conduct a
non-mandatory
pre-bid meeting
at the project site on Tuesday, October 15, 2024, at 2:00 PM. Participants will meet near 34 Madison Drive, Carson City where they will then be led to the project site.
DBE | There are no Disadvantaged Business Enterprise (DBE)/Small Business Enterprise (SBE) program goals for this procurement. However, the City, in accordance with Title VI of the Civil Rights Act of 1964 and Title 49 Code of Federal Regulations Part 26, hereby notifies all bidders and proposers that it shall affirmatively ensure that in regard to any contract entered into, certified DBE/SBE firms shall be afforded full opportunity to submit bids and proposals in response to our invitation and shall not be discriminated against on the grounds of race, color, religion, sex, sexual orientation, gender identity or expression, age, disability or national origin in consideration for an award. Although there is no contract-specific goal associated, the City encourages bidders to make the same effort to ensure nondiscrimination in the award and administration of subcontracts, to help remove barriers to the participation of DBEs/SBEs, and to assist in the development of firms that can compete successfully in the marketplace outside the DBE/SBE program.
Summary | The project consists of removing the existing coatings from the interior and exterior of the Water Tank and re-painting the tank’s interior and exterior. The project includes all common phases of construction customarily associated with this type of project. The tank is approximately fifty-five (55) feet in diameter and approximately twenty-four (24) feet tall. The area of nine thousand (9,000) square feet listed in the bid summary is only an approximation of the total interior roof, wall and floor surface areas and does not include any additional square footage for beams and columns. Re-painting of the beams, columns and other items is included in the scope of work and shall be included in the contractors bid. Additional work also includes installing a new twenty-four (24) inch wide ladder per manufacturer's recommendations, installing a LAD Safety Ladder System and Ladder Guard, installing a passive cathodic protection system, miscellaneous steel work including but not limited to installing additional handrail, removing the existing ladder, installing anchor safety points, removing Unistrut, installing new vent screens, and installing brackets for conduit as shown on the plans. This project requires a Contractor's License Class A, C-28, C-28a, or C-4.
|
| Name | Carol Akers, Purchasing & Contracts Administrator |
| Address |
City Hall - Executive Office
201 North Carson Street, Suite 2 Carson City, NV 89701 USA |
| Phone | 1 (775) 283-7362 |
| Fax | 1 (775) 887-2286 |
| cakers@carson.org |
| File Name | Description | File Size |
|
||
|
Ref01.Required_Document_Checklist_LOCAL.pdf
|
LOCAL Document Checklist (non-RTC/CAMPO) | 441 KB |
|
Ref02.Bidder_Instructions_LOCAL.docx
|
LOCAL Bidder Instructions (non-RTC/CAMPO) | 65 KB |
|
Ref03.Construction_Independent_Contractor_Agreement.pdf
|
Reference Document - Construction Independent Contractor Agreement | 3.24 MB |
|
Ref04.General_Conditions.pdf
|
Reference Document - General Conditions | 6.01 MB |
|
Ref05.Contract_Award_Information.pdf
|
Reference Document - Contract Award | 1.79 MB |
|
Ref06.2025_Prevailing_Wage_Rates.pdf
|
2025 Prevailing Wages Rates - Northern Nevada Rural Region | 637 KB |
|
Ref08.SB82_Regulations.pdf
|
Reference Document - Apprenticeship Utilization Act | 3.57 MB |
|
Ref09.Postings_&_Notices_Requirements.pdf
|
Required federal and state on-site postings. | 1.71 MB |
|
03.Vendor_Information_&_UEI_Form.pdf
|
Upload as 03.Vendor_Information_&_UEI_Form.pdf Bidder *Required with Bid* Subcontractor *Due prior to commencing work for subcontracts expected to be more than $25k* |
1.83 MB |
|
04.Bidder_1%_Subcontractor_Info.pdf
|
Email document named 04.Bidder_1%_Subcontractor_Info.pdf to CAkers@carson.org .
*GENERAL CONTRACTOR MUST SELF-LIST*
Bidder *Due from the three (3) lowest bidders within two (2) hours of bid opening* Subcontractor
N/A
|
1.85 MB |
|
05.Bidder_5%_Subcontractor_Info.pdf
|
Upload as 05.Bidder_5%_Subcontractor_Info.pdf
*GENERAL CONTRACTOR MUST SELF-LIST*
Bidder *Required with Bid* Subcontractor N/A |
1.30 MB |
|
06.Bid_Bond_Form.pdf
|
Upload as 06.Bid_Bond_Form.pdf Bidder *Required with Bid* Subcontractor N/A |
1.89 MB |
|
08.Conflict_of_Interest_Disclosure_Form.pdf
|
Upload as 08.Conflict_of_Interest_Disclosure_Form.pdf Bidder *Required with Bid* Subcontractor *Due prior to Commencing Work* |
1.75 MB |
|
09.Certification_of_Authorization_&_Understanding.pdf
|
Upload as 09.Certification_of_Authorization_&_Understanding.pdf Bidder *Required with Bid* Subcontractor *Due prior to Commencing Work* |
1.22 MB |
|
11.Bidding_Preference_Affidavit.pdf
|
Upload as 11.Bidding_Preference_Affidavit.pdf Bidder *Required with Bid if requesting a Bidding Preference for projects expected to cost more than $250k* Subcontractor N/A |
1.83 MB |

With GovernmentContracts, you can: