| Location: | South Carolina |
|---|---|
| Posted: | Aug 11, 2026 |
| Due: | Sep 8, 2026 |
| Agency: | County of Spartanburg |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
| Number | Deadline |
|
2027013
RFP# 2027013 SPARTANBURG COUNTY E911 PINE STREET ENTRANCE PROJECT
Scope: Core requirements include, but are not limited to: • 3” Surface C • 3” Milling Existing Asphalt • Remove and replace existing RCP • Install 12” Smooth Wall Pipe (HP Storm is allowed) • Rehabilitation of 2 drainage structures (This is in conjunction with the installation of the 12” Smooth Wall Pipe) • Temporary and Thermoplastic pavement markings |
09/08/2026 03:00 PM UTC |

With GovernmentContracts, you can:
...improvements, asphalt pavement and asphalt-millings parking areas, ADA parking and access... improvements, concrete ...
City of Isle of Palms
Bid Due: 9/25/2026
...) Surface C with Aramid Fiber -10" CMRB Method B -Temporary and Thermoplastic ...
County of Spartanburg
Bid Due: 10/08/2026
...improvements, asphalt pavement and asphalt-millings parking areas, ADA parking and access... improvements, concrete ...
City of Isle of Palms
Bid Due: 9/25/2026
...with 36" RCP and pavement along 2nd Street. This project includes corrective measures ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 10/05/2026