Tender available date: Sunday, July 6, 2025.
Tender closing date: Wednesday, August 6, 2025.
Pre-Tender Meeting: July 22, 2025, at 10:30:00 a.m. (local time) at WSP Canada Inc. office, 7710 Edgar Industrial Court, Red Deer, AB, T4P 4E2.
Project Inquiries: Ikhtiyar Mammadov, Project Procurement Officer, Alberta Transportation and Economic Corridors. E-mail:
Ikhtiyar.Mammadov@gov.ab.ca
.
TENDERS will only be received by email at
trans.tender@gov.ab.ca
, before 2:01:00 P.M., for construction of the following work:
TND0025141
Minor Grade Widening, Cold Milling, Granular Base Course (GBC), Asphalt Concrete Pavement (ACP) and Other Work
2:26, Highway 2 Safety Improvements (N. of Hwy. 604 to Hwy. 53)
kilometre 35.160 to 45.196 (NBL,SBL)
2:28, Highway 2 Safety Improvements (Hwy. 53 to N. of Hwy. 611)
kilometre 0.000 to 19.800 (NBL,SBL)
CENTRAL REGION
APPROXIMATE QUANTITIES:
1 Allowance Partial Completion Bonus
1 Lump Sum Traffic Accommodation and Temporary Signing
114,500 Tonne Supply of Aggregate - No Option
1 Lump Sum Site Isolation and Water Accommodation
11,400 Metre Cutting of Pavement
46,500 Square Metre Cold Milling Asphalt Pavement
45 Metre Culverts - Supply and Install (450 mm dia. R.G.R.C.P.)
70 Metre Culverts - Supply and Install (600 mm dia. R.G.R.C.P.)
145 Cubic Metre Grouting of Abandoned Culverts
114,500 Cubic Metre Common Excavation
61,500 Cubic Metre Borrow Excavation - Contractor Supplied
24,000 Square Metre Stabilization Geotextile - Supply and Install (Class 1A)
77,500 Tonne Granular Base Course Des. 2 Class 25
37,000 Tonne Asphalt Concrete Pavement - Superpave – Mix Type 100-F-12.5 (PG 64-34)
136,200 Square Metre Topsoil Placement
2.75 Kilometre Roadway Lines - Supplying Paint and Painting (Lane Dividing and 2 Edge Lines)
43.10 Kilometre Milled Rumble Strip - Shoulder
888 Metre Strong Post W-Beam Guardrail - Supply and Install
44 Base Concrete Base - Supply and Install
1 Lump Sum Demolition and Disposal of Bridge Structure (Overhead Sign Structure - B.F. 75651ZS-5)
Contractor to supply all materials.
Contract Completion Date: July 31, 2026.