| Location: | Connecticut |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GU-25-Q7 |
| Publication URL: | To access bid details, please log in. |
WWTF Primary Effluent Pump Station Upgrades Work includes associated demolition work, concrete, piping, instrumentation and electrical conduit and wire as shown on the contract drawings and listed in the technical specifications. Pre-Bid Conference - 09/18/2025 10:00 am (not mandatory) at Groton Water Pollution Control Facility, 311 Thames Street, Groton, CT Bid Documents can be obtained via Wright-Pierce: https://www.wright-pierce.com/project/groton-ct-wwtf-primary-effluent-pump-station-upgrades/
Wright-Pierce Therlin Montgomery Project Engineer

With GovernmentContracts, you can:
...Sewage Sludge & Wastewater Hauling and Disposal The Town of Glastonbury, Water Pollution... ...
State Government of Connecticut
Bid Due: 11/10/2026
...Bid Title: EXTENDED-Academy Wastewater Feasibility Study Category: Town Bid/RFP Postings Status...: Open Description: ...
Town of Madison
Bid Due: 11/06/2026
...RFQ: On-Call Engineering Services for Wastewater-Related Needs The Town of Stafford Water... on-call ...
State Government of Connecticut
Bid Due: 11/17/2026
...Description Opening Date/Time Closing Date/Time RFQ: On-Call Engineering Services for Wastewater...
Town of Stafford
Bid Due: 11/16/2026