| Location: | Connecticut |
|---|---|
| Posted: | Sep 17, 2025 |
| Due: | Oct 2, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | GU-25-Q7 |
| Publication URL: | To access bid details, please log in. |
WWTF Primary Effluent Pump Station Upgrades Work includes associated demolition work, concrete, piping, instrumentation and electrical conduit and wire as shown on the contract drawings and listed in the technical specifications. Pre-Bid Conference - 09/18/2025 10:00 am (not mandatory) at Groton Water Pollution Control Facility, 311 Thames Street, Groton, CT Bid Documents can be obtained via Wright-Pierce: https://www.wright-pierce.com/project/groton-ct-wwtf-primary-effluent-pump-station-upgrades/
Wright-Pierce Therlin Montgomery Project Engineer

With GovernmentContracts, you can:
...Parker Terrace Wastewater Pumping Station Upgrades The Town of Glastonbury will receive on-line... ...
State Government of Connecticut
Bid Due: 8/04/2026
...(KWPCF), associated wastewater pump stations, and the Brooklyn Water Pollution Control Authority...
State Government of Connecticut
Bid Due: 8/10/2026
...inspections of large diameter sanitary sewer pipes within the City's wastewater collection system. ...
City of Waterbury
Bid Due: 8/05/2026