Item # 1:
(
72-10
-
16
)
|
Scope of work detailed in specifications include installation of high-density (HD) shelving within Space 146, along with related improvements to accommodate new system. Work include provision & installation of loading dock lift, any associated improvements required to support its operation, project related signage installed to address wayfinding & code compliance requirements, replace a portion of the roof area above Rm 146, demolition, repairs, integration with existing roof system
|
|
U N S P S C Code:
|
72-10-16
Roofing and siding and sheet metal work
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 2:
(
72-10
-
22
)
|
Scope of work detailed in specifications include installation of high-density (HD) shelving within Space 146, along with related improvements to accommodate new system. Work include provision & installation of loading dock lift, any associated improvements required to support its operation, project related signage installed to address wayfinding & code compliance requirements, replace a portion of the roof area above Rm 146, demolition, repairs, integration with existing roof system
|
|
U N S P S C Code:
|
72-10-22
Electrical services
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 3:
(
72-10
-
24
)
|
Scope of work detailed in specifications include installation of high-density (HD) shelving within Space 146, along with related improvements to accommodate new system. Work include provision & installation of loading dock lift, any associated improvements required to support its operation, project related signage installed to address wayfinding & code compliance requirements, replace a portion of the roof area above Rm 146, demolition, repairs, integration with existing roof system
|
|
U N S P S C Code:
|
72-10-24
Painting and paper hanging
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 4:
(
72-13
-
00
)
|
Scope of work detailed in specifications include installation of high-density (HD) shelving within Space 146, along with related improvements to accommodate new system. Work include provision & installation of loading dock lift, any associated improvements required to support its operation, project related signage installed to address wayfinding & code compliance requirements, replace a portion of the roof area above Rm 146, demolition, repairs, integration with existing roof system
|
|
U N S P S C Code:
|
72-13-00
General building construction
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
Item # 5:
(
72-15
-
25
)
|
Scope of work detailed in specifications include installation of high-density (HD) shelving within Space 146, along with related improvements to accommodate new system. Work include provision & installation of loading dock lift, any associated improvements required to support its operation, project related signage installed to address wayfinding & code compliance requirements, replace a portion of the roof area above Rm 146, demolition, repairs, integration with existing roof system
|
|
U N S P S C Code:
|
72-15-25
Floor laying services
|
|
Qty
|
Unit Cost
|
UOM
|
Total Discount Amt.
|
Total Cost
|
1.0
|
|
EA - Each
|
|
|
Manufacturer:
|
|
Brand:
|
|
Model:
|
|
Make:
|
|
Packaging:
|
|
|
|
|
|
|
|
|
|