| Location: | Illinois |
|---|---|
| Posted: | Oct 31, 2024 |
| Due: | Nov 8, 2024 |
| Agency: | ENERGY, DEPARTMENT OF |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | ISD-341872-DH |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Dorm 4 in the Village needs updating, below are the proposed upgrades.
- Replace the existing decrepit drop ceiling with a drywall ceiling matching the rest of the dorm.
- New Attic Hatches to be installed in the main hallways where the old rusty existing ones are.
- New LED Fixtures to be installed throughout the dorm.
- New (Fermilab supplied) Carpet Tiles will replace throughout where the old existing carpet is located.
- Vinyl Plank Flooring to be installed at the Front Door Entrance, Kitchen, Dining Room, and Bathrooms.
- Interior Walls, Ceilings and Kitchen Cabinets will be painted. (Walls to be Light French Grey, Ceiling to
be White and Cabinets to get painted a Darker Grey).
- Bathrooms to have FRP installed on ceiling and walls to mitigate excess moisture.
- Bathrooms to receive new Toilets, Vanities, Mirrors, Tub/Shower Enclosure, Faucets and LED Fan/Light
Combo.
- Kitchen to receive new Laminate Countertops, new Stainless Steel Kitchen Sink and new double
handle Faucet with side sprayer.
- Exterior Lighting to be updated to LED Fixtures throughout.
- New Exterior Doors to be installed WITHOUT storm doors at the entrance/exit locations. (3) in total.
| Sep 24, 2024 | [Solicitation (Original)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |
| Sep 27, 2024 | [Solicitation (Updated)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |
| Oct 1, 2024 | [Solicitation (Updated)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |
| Oct 9, 2024 | [Solicitation (Updated)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |
| Oct 22, 2024 | [Solicitation (Updated)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |
| Oct 28, 2024 | [Solicitation (Updated)] ISD-341872-DH - Renovations of Fermilab’s Dorm 4 in “The Village” |

With GovernmentContracts, you can:
Follow UNICOR Marion Request for Quote Various Connectors. See Attached Active Contract Opportunity
JUSTICE, DEPARTMENT OF
Bid Due: 11/21/2026
ADA Self-Evaluation & Transtition Plan Consulting Services Bid No. #2026-10-08 Provision of consulting
Skokie village
Bid Due: 12/16/2026
Follow Airlift Efficiency Commercial Solutions Opening (CSO) Active Contract Opportunity Notice ID FA4452-25-S-C001
DEPT OF DEFENSE
Bid Due: 2/26/2028
Bid Solicitation # 27-340IAGO-IAGO3-B-51927 Bid Solicitation # 27-340IAGO-IAGO3-B-51927 Organization Name IAGO - Illinois
State Government of Illinois
Bid Due: 4/29/2027