5709 - Construction Management Services for Replace Asphalt Concrete Surfacing Project 2026 ** Addendum No. 1 Issued 7/15/2026 **

Location: California
Posted: Jul 15, 2026
Due: Jul 20, 2026
Agency: City of Redding
Type of Government: State & Local
Category:
  • 56 - Construction and Building Materials
  • R - Professional, Administrative and Management Support Services
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Open Date Description Close Date

June 29, 2026
5709 - Construction Management Services for Replace Asphalt Concrete Surfacing Project 2026 ** Addendum No. 1 Issued 7/15/2026 **
OPEN

July 20, 2026

Attachment Preview

June 29, 2026
REQUEST FOR PROPOSAL
FOR
CONSTRUCTION MANAGEMENT SERVICES FOR
REPLACE ASPHALT CONCRETE SURFACING PROJECT 2026
FOR THE
CITY OF REDDING, CALIFORNIA
(Schedule Number 5709)
In accordance with the provisions of the Municipal Code of the City of Redding, sealed
proposals must be submitted to the City Clerk’s 3rd floor office located at City Hall, 777 Cypress
Avenue, Redding, California 96001 prior to 3:00 p.m. PT, Monday, July 20, 2026, for furnishing
the City of Redding a proposal for providing Construction Management Services for replace asphalt
concrete surfacing project 2026, per specifications and general conditions.
PROPOSALS RECEIVED AFTER THIS TIME AND DATE MAY NOT BE ACCEPTED
OR CONSIDERED.
The said proposals will be opened at 3:00 p.m. PT, on Monday, July 20, 2026, in the
designated City Hall Conference Room as posted in the main lobby of City Hall, 777 Cypress
Avenue, Redding, California.
The proposer shall provide the original (unbound), four (4) copies and a USB drive with a
PDF copy of the proposal. Electronic submission of proposals will not be allowed. One (1) set of
the Fee Proposal is to be submitted in a separate, sealed envelope. Proposal package may be
obtained
from
the
City’s
website,
https://www.cityofredding.gov/government/departments/purchasing/bid_opportunities.php. The
City will award any resulting contract in a manner consistent with the City Purchasing Ordinance.
The cut-off date and time for receiving questions regarding this bid is 5:00 p.m. PT, on
Wednesday, July 8, 2026. All inquiries must be made in writing and may be submitted to the email
address shown below.
THE CITY OF REDDING
Purchasing Division
Michelle Kempley, Purchasing Officer
mkempley@cityofredding.gov
NOTE
If a potential bidder/proposer received this solicitation document through
some means other than surface mail from the City of Redding (such as from the City
of Redding Internet web site, or from another prospective bidder/proposer), it is the
responsibility of the potential bidder/proposer to advise the assigned City of Redding
Purchasing contact of its intention to submit a bid/proposal so that any addenda or
other correspondence related to this solicitation will be sent to the potential
bidder/proposer. When contacting the Purchasing Division, the bidder/proposer shall
provide the solicitation number located on the cover page of this document.
Transmittal of this information must be in writing, by U.S. Mail, or e-mail.
Transmittal of this information via telephone is not acceptable.
Please submit bid/proposal as directed in the RFP package. Forward to:
City of Redding
City Clerk
777 Cypress Avenue
Redding, CA 96001
Proposals must be received by the City Clerk’s office prior to 3:00 p.m. PT on the date
indicated below. Mailing envelope is to be clearly marked on the outside with the following
notation:
“Proposal for Schedule No. 5709; opening at
3:00 P.M., on Monday, July 20, 2026”
Note: Signatures must be legible, indicating full first and last name.
The City of Redding
Purchasing Division
CITY OF REDDING
REQUEST FOR PROPOSALS
FOR CONSTRUCTION MANAGEMENT SERVICES FOR
REPLACE ASPHALT CONCRETE SURFACING PROJECT 2026
(Schedule No. 5709)
I. INTRODUCTION
The City of Redding (City) is soliciting proposals for construction management services including
inspection, materials testing, and resident engineering duties for the Replace Asphalt Concrete
Surfacing Project 2026 (Project). The link to the project plans shows the locations of the project in
the City of Redding. The project is funded with general street funds.
The plans, specifications, and estimates for the project have been prepared by City staff. The
purpose of this project is to improve pavement conditions and reduce maintenance costs on
City streets, including portions of Browning Street, Canby Road, and Mistletoe Lane.
This project will include wedge grinding, conform grinding, asphalt concrete digouts, paving
fabrics/geogrids, asphalt concrete paving, adjusting of valve boxes and manholes, shoulder
backing, concrete ramps and sidewalks, traffic control, striping, signs and pavement markings.
The current construction cost, not including contingencies or construction management, is
$2.6 million. There will be 50 workings days for construction of the project.
The scope of work includes services prior to construction, services during construction, and
services after construction. A consultant services agreement will be executed for the
combined services. It is the intent of the City to hire a consultant who will provide complete
construction management, resident engineering, perform materials testing, and inspect the
construction of the project with minimal support from City personnel.
II. REVIEW OF BACKGROUND INFORMATION
The following items are available via the shown links below and can be accessed through the
City of Redding’s Engineering – Public Works Bid Opportunities webpage.
Engineering – Public Works Bid Opportunities “Bid 5713”
Plans
Project Specifications
Project Categorical Exemptions/Categorical Exclusion
City of Redding Construction Standards Construction Standards (CORCS)
III. GENERAL
The Consultant shall play an active role in the management of the project to maintain the
project schedule and budget and to protect the City against defects and deficiencies on the part
of the construction Contractor. Services provided during construction will, in general, consist
of project management, construction contract administration, construction inspection, and
materials testing including source inspection as needed. In doing so, the Consultant will serve
as the focal point for coordination between the Contractor, the City, and utility companies.
The Consultant’s work plan and expected level of effort should consider the schedule imposed
on the Contractor, including what can be reasonable expected for overtime inspection.
The Consultant will be responsible for their own office and administrative space including
telephone, restroom, and computer facilities. The City will not provide these facilities.
The Consultant shall assure the City that it will comply with the Americans with Disabilities
Act (ADA, as well as all applicable regulations and guidelines issued pursuant to the ADA
(42 U.S.C. 12101 et seq.).
The Consultant must comply with Government Code § 8355 in matters related to providing a
drug-free workplace.
IV. SCOPE OF SERVICES
Prior to Construction
1. File Review – Review project files and plans including quantity calculations;
memorandums to Resident Engineer; geotechnical reports; hydraulic studies;
discovery plans; etc.
2. Schedule Review – Prepare a tentative schedule that identifies construction stages,
utility relocations, notification timelines for permits and agreements, and all items that
will be submitted by the Contractor for review and approval.
3. Preconstruction Conference – Organize a preconstruction conference with the
Contractor, Subcontractors, City, to discuss the work involved, administrative matters,
labor compliance, safety and accident prevention, answer questions from the
contractors, and address issues that need to be resolved before work commences.
During Construction
4. Construction Meetings – Conduct regularly scheduled construction status meetings
to review project schedule, potential change orders, progress payments, and future
material testing needs; facilitate decision making and discuss issues that have the
potential of adversely affecting the project budget, schedule, or product. Consultant
shall prepare meeting agenda in consultation with City Construction Manager.
5. Coordination – Coordinate all administrative, inspection, and testing activities of the
construction contract.
Page 2 of 8
6. Contract Documents – Interpret the intent of the plans and specifications to protect
the City against defects and deficiencies on the part of the Contractor and maintain the
project budget and schedule.
7. Labor Compliance – Perform labor compliance tasks, including verifying certified
payrolls, subcontractor and apprentice utilization, and labor interviews.
8. Progress Reports – Prepare monthly progress reports and submit to the City. The
reports will address the progress of the work, the project schedule,
information/decisions required to maintain the schedule and complete deliverables,
problems encountered that may affect the schedule, budget work products, anticipated
work for the following week and month, and should contain photographs documenting
the progress of the work.
9. Contractor Inquiries – Prepare responses to RFI’s in compliance with the plans,
specifications and City procedures for City’s approval.
10. Contract Change Orders – Prepare change orders in compliance with the
specifications and City procedures for City’s approval.
11. Progress Payments – Analyze Contractor’s initial schedule of values for
reasonableness. Reconcile and document items of work in compliance with the
specifications and prepare monthly progress payments in compliance with City
procedures for City’s approval.
12. Project Schedule - Monitor and analyze Contractor’s schedule for compliance with
the specifications and permit requirements.
13. Project Budget – Monitor and analyze project expenditures, track earned value,
forecast project costs, and develop strategies to keep project within budget.
14. Utility Coordination – Coordinate with the appropriate utility companies for work
that affects its specific utility.
15. Project Submittals – Coordinate, document, and make engineering recommendations
regarding submittals and their compliance with the plans and specifications for the
City’s and design engineer’s approval.
16. Materials Testing – Coordinate, conduct, interpret, and supervise all required soils
and material tests.
17. Surveying – Provide review and approval of Contractor’s construction staking requests
(if applicable) to ensure adequacy and accuracy. Construction surveying and staking
will be the responsibility of the Contractor.
Page 3 of 8
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...RFP - Construction Management Services Due Date - To allow sufficient time for ...

Friant Water Authority

Bid Due: 7/31/2026

...Management and Advisory Services 08/18/26 RFP Package PDF Q & A Finance 06/22/26 ...

City of Elk Grove

Bid Due: 8/18/2026

...Project ID: 2026-GEN-0062 Title: Banking Treasury Management Services Addenda: 0 Release Date: 6.../22/2026 ...

Sacramento County

Bid Due: 7/31/2026

...R--Environmental Management Support Services Solicitation Number: N6339408SNU02 Agency: Department... Environmental Management Support Services. ...

Department of the Navy

Bid Due: 7/30/2028

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.