| Question | Date Asked | Answer | Date Answered |
| Are there plans associated with this project? | 6/23/2026 10:08:44 AM | Plans have been requested and will be posted by end of business day tomorrow, June 24th. | 6/23/2026 10:11:17 AM |
| Are there plans associated with this project? | 6/23/2026 10:15:11 AM | Plans have been requested and will be posted by end of business day tomorrow, June 24th. | 6/23/2026 10:28:51 AM |
| Are there plans associated with this project? | 6/23/2026 11:21:13 AM | Plans have been requested and will be posted by end of business day tomorrow, June 24th. | 6/23/2026 11:24:49 AM |
| Are there plans associated with this project? | 6/23/2026 12:34:52 PM | Plans posted June 24th along with addendum #1. | 6/29/2026 2:49:11 PM |
|
Will there be a site visit or pre-bid meeting?
|
6/25/2026 1:32:59 PM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:08:06 AM |
| Is there an engineer estimate? | 6/25/2026 1:33:09 PM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:08:35 AM |
| Please provide the liquidated damages associated with this project. | 6/26/2026 11:46:16 AM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:08:46 AM |
| Please clarify if submittals will be accepted via Vendorlink. The IFB indicated submittals can be uploaded, although Vendorlink indicates No Online Submissions. | 6/26/2026 12:31:50 PM | Yes, submittals will be accepted via VendorLink. Correction will be made on portal. | 6/29/2026 3:15:22 PM |
|
We respectfully request approval of OBIC 5000 Structural Polyurethane Hybrid Coating as an alternate lining system for infrastructure rehabilitation.
OBIC 5000 is a 100% solids, fast-set, spray-applied polyurethane hybrid coating designed to reinstate structural integrity, provide infiltration control, corrosion resistance, and asset life extension. It creates a seamless, monolithic waterproof membrane suitable for wastewater, stormwater, concrete, steel, masonry, pipe, and culvert applications. OBIC 5000 has passed SWAT testing in accordance with ASTM G-210-13 and is designed for use in demanding wastewater and infrastructure environments. Please see the attached technical data sheet for review and approved equal consideration of OBIC lining systems. |
6/29/2026 1:31:33 PM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:09:15 AM |
|
Door schedule says Aluminum Anodized bronze frames and doors. Specs are written for Hollow Metal frames and doors.
Does the owner want Aluminum producst or Hollow Metal steel products? |
6/29/2026 2:46:19 PM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:09:26 AM |
|
There doesn`t appear to be a written description of what is to be included in each bid item on the bid form. Can you please provide a measurement and payment spec section that will describe each item?
i.e. - what is the difference between "Earthwork" and "Sitework"? Also, what is defined as "Equipment" that we are to provide purchase and installation pricing for? |
7/6/2026 8:33:52 AM | Please note that Addendum #2 will be posted to address these questions. | 7/13/2026 8:09:47 AM |
| Some of the electrical plans seem to indicate, by bold black lettering, that there might be new pumps being installed as a part of this project. Is this correct? Are there any new pumps being provided? | 7/6/2026 8:35:30 AM | Please note that Addendum #2 will be posted to address these questions. | 7/13/2026 8:10:11 AM |
| The "A" section of the plans have some discrepancies. The Material Finish Schedule as well as the specifications call for a standing seam metal roof, but the roof plan & details call for asphalt shingles. Which is correct? | 7/6/2026 8:51:22 AM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:10:30 AM |
| Specification section 09290 is for Gypsum Board. We can`t find on the plans where this is called for. Is there gypsum board on this project? | 7/6/2026 8:53:22 AM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:10:46 AM |
| Specification section is for "Screen Mesh Wall System". Where is this system shown on the plans and where is it to be installed? | 7/6/2026 9:13:25 AM | Please note that Addendum #2 will be posted to address this question. | 7/13/2026 8:10:59 AM |
| We asked a previous question about the gypsum board. We do see it now on page A101 of the plans, but other details are calling for the ceiling to be Hardi board. Please clarify the ceiling details. | 7/6/2026 1:32:58 PM | Please note that Addendum #2 will be posted to address this concern. | 7/13/2026 8:11:31 AM |
|
Switchboard Spec 16107, 1.01.B. EDP is installed indoors in the electrical room with other equipment. Please confirm enclosure rating requirement of N4X is needed.
|
7/6/2026 3:48:29 PM | Please note that Addendum #2 will be posted to address this concern. | 7/13/2026 8:11:58 AM |
| Switchboard Spec 16107, 2.01.B. QED-6 requires rear access as the equipment connections are in the back of the switchboard. Room layout shows EDP installed up against the wall meaning QED-6 will not work. Please confirm QED-2 is acceptable. | 7/6/2026 3:48:52 PM | Please note that Addendum #2 will be posted to address this concern. | 7/13/2026 8:12:20 AM |
|
1. Does the face of gravity wall above grade need to be coated?
2. What is the material of the handrail on top of gravity wall, and also does it need to be painted? 3. Does any of the exiting piping on site need to be painted? |
7/8/2026 9:54:23 AM | Please note that Addendum #2 will be posted to address these questions. | 7/13/2026 8:12:46 AM |
| Please clarify if anything other than the building will receive any paints/coatings. If so, please define. | 7/8/2026 9:56:08 AM | Please note that Addendum #2 will be posted to address this concern. | 7/13/2026 8:13:08 AM |
|
Project specifications are for hollow metal doors and frames, with references to FRP doors and frames also. We see no specifications for aluminum doors or frames. Plansheet A201 shows FRP material at Door 101A. Plansheet A500 (Door Schedule) calls for aluminum doors and frames. Which product shall we price?
Project door hardware specification section 08710, page 10, shows a different hardware selection than the hardware schedule on Plansheet A500. Which schedule shall we use? |
7/13/2026 7:51:46 AM | Please note that Addendum #2 will be posted to address these questions. | 7/13/2026 8:13:27 AM |
| LIGHT POLE - where are they on the drawings? | 7/15/2026 12:30:57 PM | ||
| Multiple manufacturers came back and said they don`t make the switchboard NEMA4X 316 S.S ABB said they do not have the product. Please advise? | 7/15/2026 12:31:28 PM | ||
|
Specifications section 16402 states "Ducts shall be PVC type DB encased in concrete. Direct buried conduits shall not be allowed."
Sheet E-03 Note 1 states "Concrete encased duct banks to be used on roadways." Also, conduit sections on sheet E-06 does not appear to show any concrete encasement for underground conduits, existing or proposed. Please confirm if concrete encasement will be required across all underground conduits, only for conduit sections crossing roadways, or not required at all. Thank you. |
7/15/2026 2:28:55 PM | ||
|
Specifications section 16402 states "Ducts shall be PVC type DB encased in concrete. Direct buried conduits shall not be allowed."
Sheet E-03 Note 1 states "Concrete encased duct banks to be used on roadways." Also, conduit sections on sheet E-06 does not appear to show any concrete encasement for underground conduits, existing or proposed. Please confirm if concrete encasement will be required across all underground conduits, only for conduit sections crossing roadways, or not required at all. Thank you. |
7/15/2026 4:55:16 PM |
| Code | Description |
| [100-51] | Pumps, Drum |
| [720-56] | Pumps, Miscellaneous (Not Otherwise Classified) |
| [936-62] | Pumps and Pump Accessories Maintenance and Repair |
| [936-63] | Pumps, Vertical, Maintenance and Repair |
| [981-57] | Pumps and Pump Accessory Rental or Lease |
| [720-64] | Sewage and Sludge Pumps, Submersible |
| [720-67] | Sewage and Sludge Pumps, Surface Mounted |
| Publication | Date |

With GovernmentContracts, you can:
...CONSTRUCTION OF POLE BARN Bid No. 2026-05 Status: Closes: Open 8/18/2026 2:00 PM...
City of Palatka
Bid Due: 8/18/2026
...Construction Advertisement Number: AWARD-DOT-10/11-7008SD Version Number: 000 Advertisement Begin Date...
State Government of Florida
Bid Due: 10/11/2070
...Title Construction Management Continuing Services Solicitation Type RFP - Non-Construction Status... for Qualifications ...
City of Jacksonville
Bid Due: 8/20/2026
...Description: Guardrail Continuing Services Construction Contract Department: Facilities Dev &... for Prequalifications (RPQ) ...
Palm Beach County
Bid Due: 7/06/2030