| Project Title: | CELL 12B &13 CONSTRUCTION AND LAGOON RELINING PROJECT |
| Description: | The project will consist of construction of landfill Cells 12B & 13 and the relining of the County’s leachate lagoon at the landfill, 5210 US Highway 421 North, Wilmington, NC. The construction period for the project will be 270 days from the notice to proceed to substantial completion and an additional 30 days to final completion. The landfill cell expansion consists of approximately 5 acres for Cell 12B & 10.5 acres for Cell 13, including, but not limited to, site preparation, grading, placement of the liner system, placement of the soil cover systems, associated hauling and perimeter roads, stormwater management systems, leachate collection piping, sump and pumps, electrical and control panels, and rain tarp (Bid Alternate) with County coordination. Fill soil for the preparation of the subgrade and protective cover shall be supplied from on-site excavation sources and topsoil will be supplied from off-site borrow source by the CONTRACTOR. The project also consists of approximately 3,000 linear feet of new leachate forcemain and 1,500 feet of access road extension and associated grading. The leachate lagoon will consist of liner removal, raising of the lagoon berm, and relining of the lagoon, as shown in the contract documents. Bid Alternates will include addition of 12-mil Rain Tarp following completion of the landfill cell and logging/timbering of acreage at the front property of the site. |
| Opening Date: | 11/7/2025 2:00 PM |
| Posted Date: | 9/18/2025 |
| Status: | Open |
| Department: | COUNTY OF NEW HANOVER |
|
Solicitation Number
*
338-26-0169
|
Department
COUNTY OF NEW HANOVER
|
Status Reason
Open
|
|
|
Opening Date
2025-11-07T14:00:00.0000000
|
Posted Date
*
2025-09-17T16:57:44.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
2025-10-01T04:00:00.0000000Z
|
Special Instructions
Dept. of Recycling and Solid Waste Building, 3002 Highway 421 North, Wilmington, NC. 28401
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The project will consist of construction of landfill Cells 12B & 13 and the relining of the County’s leachate lagoon at the landfill, 5210 US Highway 421 North, Wilmington, NC. The construction period for the project will be 270 days from the notice to proceed to substantial completion and an additional 30 days to final completion. The landfill cell expansion consists of approximately 5 acres for Cell 12B & 10.5 acres for Cell 13, including, but not limited to, site preparation, grading, placement of the liner system, placement of the soil cover systems, associated hauling and perimeter roads, stormwater management systems, leachate collection piping, sump and pumps, electrical and control panels, and rain tarp (Bid Alternate) with County coordination. Fill soil for the preparation of the subgrade and protective cover shall be supplied from on-site excavation sources and topsoil will be supplied from off-site borrow source by the CONTRACTOR. The project also consists of approximately 3,000 linear feet of new leachate forcemain and 1,500 feet of access road extension and associated grading. The leachate lagoon will consist of liner removal, raising of the lagoon berm, and relining of the lagoon, as shown in the contract documents. Bid Alternates will include addition of 12-mil Rain Tarp following completion of the landfill cell and logging/timbering of acreage at the front property of the site.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
.... Alternate No. 2 - Electrical Panels to be Square D electrical panels. ...