| Location: | Washington |
|---|---|
| Posted: | Dec 17, 2024 |
| Due: | Jan 14, 2025 |
| Agency: | City of Vancouver |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB 25-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Contractor shall furnish and install approximately 3,018 linear feet of 8-inch ductile iron water main, 70 LF of 6-inch ductile iron water main, 30 linear feet of 4-inch ductile iron water main, fire hydrants, and other appurtenances as shown on the Plans and specified herein.
The Contractor shall also furnish and install approximately 762 lineal feet of 8-inch PVC gravity sewer main. The sewer will be installed within the existing City of Vancouver right-of-way, including all laterals, manholes, and all appurtenances as shown on the plans and specified herein.
The Contractor shall restore the existing pavement where trenching takes place as specified herein, and grind and replace the existing pavement outside of the trench areas where shown on the plans and specified herein.
The Contract Work shall be Physically Complete within 70 Working Days from the Notice to Proceed.
Engineer's Estimate - $1,200,000

With GovernmentContracts, you can:
...Bid Number: PW-0161 Bid Title: 95TH PLACE SEWER AND WATER IMPROVEMENTS PROJECT Category: ...
City of Bothell
Bid Due: 12/03/2026
...of the construction of approximately 10 linear feet of storm sewer, 2 drainage ...
City of Spokane
Bid Due: 12/08/2026
...of the construction of approximately 10 linear feet of storm sewer, 2 drainage ...
City of Spokane
Bid Due: 12/08/2026
...of the construction of approximately 10 linear feet of storm sewer, 2 drainage ...
City of Spokane
Bid Due: 12/08/2026