| Location: | Utah |
|---|---|
| Posted: | May 27, 2026 |
| Due: | Jun 3, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PRK25017 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed consists of furnishing and installing the equipment, facilities, services, and appurtenances indicated in the Contract Documents. The Work generally includes, but is not limited to, the following: Regrading and resurfacing of the existing trail, relocating or installing new irrigation heads, replacing existing timber steps, installing timber retaining wall, installing concrete steps and metal railing, installing crib wall, installing boulder retaining wall, and installing rootwad and rock streambank slope protection. Protection of Red Butte Creek will be fundamental to the Work.

With GovernmentContracts, you can:
..., consisting of the following: (1) The construction of a 12' by 10' ...
State Government of Utah
Bid Due: 6/16/2026
...garage screen walls. Structural engineered metal structures. Construction Cost Estimate: $225,000.00...
State Government of Utah
Bid Due: 6/04/2026
...energy efficiency. Refurbish or replace hollow metal and storefront systems where occurs. Construction ...
State Government of Utah
Bid Due: 6/10/2026
...: 877597-1, Description: Explosive 1.4S, UN 0323, metal body, hexagonal midsection, 7 pin ...
DEPT OF DEFENSE
Bid Due: 6/15/2026