| Location: | Utah |
|---|---|
| Posted: | Dec 17, 2024 |
| Due: | Dec 20, 2024 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2024-027 |
| Publication URL: | To access bid details, please log in. |
Project Description: Remove concrete that is partially blocking an existing 12” RCP sewer main located in 400 S at a bridge crossing Hobble Creek near the intersection with S Glenwood Dr. The existing sewer main is approximately 50’ and will need to be accessed via one of two SSMH located in 400 S. Between 5” to 8” of concrete is currently restricting the flow in the 12” pipe, it is unknown if the entire length of pipe is restricted but it potentially may be.

With GovernmentContracts, you can:
...drain pipes, saw-cut and removal of asphalt, installation of storm drain catch basin, ...
State Government of Utah
Bid Due: 11/19/2026
...includes the replacement of 4" asbestos cement pipe (abandoned in place) with 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2027
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/21/2026
...of Performance: UT 84078 USA Description This project includes the replacement of 4" ...
AGRICULTURE, DEPARTMENT OF
Bid Due: 12/01/2026