| Location: | Utah |
|---|---|
| Posted: | Dec 17, 2024 |
| Due: | Dec 20, 2024 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB 2024-027 |
| Publication URL: | To access bid details, please log in. |
Project Description: Remove concrete that is partially blocking an existing 12” RCP sewer main located in 400 S at a bridge crossing Hobble Creek near the intersection with S Glenwood Dr. The existing sewer main is approximately 50’ and will need to be accessed via one of two SSMH located in 400 S. Between 5” to 8” of concrete is currently restricting the flow in the 12” pipe, it is unknown if the entire length of pipe is restricted but it potentially may be.

With GovernmentContracts, you can:
...Project: NS26-148 Hinckley Town - Sewer Lagoon Improvements Phase 1 Ref. #: NS26-148 ...
State Government of Utah
Bid Due: 7/10/2026
...Description: The Issuing Office for the Bidding Documents is: Hanna Water and Sewer ...
State Government of Utah
Bid Due: 6/30/2026
...is comprised of approximately 1,100 miles of sanitary sewer lines. The District owns ...
State Government of Utah
Bid Due: 9/17/2026
...seeks a qualified Utah-licensed contractor to rehabilitate 20 sanitary sewer manholes using 100% ...
State Government of Utah
Bid Due: 6/30/2026