| Location: | Ohio |
|---|---|
| Posted: | Aug 10, 2026 |
| Due: | Sep 9, 2026 |
| Agency: | Cleveland Metropolitan School District |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | ITB-21448 |
| Publication URL: | To access bid details, please log in. |
Project ID: ITB-21448
Title: Renovation at JFK High School - Welding Lab
Addenda: 0
Release Date: 8/10/2026
Due Date: 9/9/2026
JFKHS was constructed in 2020. The new welding lab will be the second in the district.
The Welding Fabrication concentration within the Metallurgy pathway prepares students for highdemand careers in metalworking, manufacturing, and construction. Through courses such as Gas Metal
Arc Welding, Shielded Metal Arc Welding, Gas Tungsten Arc Welding, and Flux Cored Arc Welding,
this hands-on CTE program teaches the essential skills of welding and fabrication, combining technical
precision with craftsmanship to create and repair metal structures and components.
METALLURGY PATHWAY
• Gas Metal Arc Welding: Students will use the Gas Metal Arc Welding process (GMAW) to safely join
various types of metal.
• Shielded Metal Arc Welding: Focuses on stick welding techniques, teaching students how to join and
repair metals using electric current and electrodes.
• Gas Tungsten Arc Welding: Covers TIG welding, a precise method used for high-quality welds on
metals like aluminum and stainless steel.
• Flux Cored Arc Welding: Students will be able to use the Flux Cored Arc Welding process (FCAW) to
safely join various types of metal.

With GovernmentContracts, you can:
...Local Higher Education 2027 A&E Prequalification A/E $1,000,000 N/A TBD Request for Qualifications... ...
Ohio Facility Construction Commission
Bid Due: 9/24/2026
...Higher Education Ross Heart Hospital - Roof Replacement D-B $2,720,000 N/A TBD Request...: ...
Ohio Facility Construction Commission
Bid Due: 10/08/2026
...Project Cost Q&A Short List Notes 2026/09/14 2026/09/30 20260615 NEOMED Local Higher Education ...
Ohio Facility Construction Commission
Bid Due: 9/30/2026
...Higher Education Aronoff Lab - RO System Upgrade D-B $596,000 N/A TBD Request ...
Ohio Facility Construction Commission
Bid Due: 9/25/2026