| Location: | Minnesota |
|---|---|
| Posted: | Feb 16, 2026 |
| Due: | Mar 9, 2026 |
| Agency: | University of Minnesota |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 03-444-26-0216 |
| Publication URL: | To access bid details, please log in. |
Bid Information
| Type | Construction Services |
| Status | Issued |
| Number | 03-444-26-0216 (UMD Multi-Building Roof Replacements) |
| Issue Date & Time | 2/16/2026 11:23:07 AM (CT) |
| Close Date & Time | 3/9/2026 02:00:00 PM (CT) |
| Question Cut Off Date | 2/27/2026 12:00:00 PM (CT) |
| Notes |
The University is requesting Proposals to provide
Construction Services
for roof replacement of three buildings located on the Duluth campus
. Refer to the Request for Proposal documents (found in the Attachments tab) for full project details/requirements.
Your only contact regarding this RFP shall be the Bid Contact noted here.
Before submitting questions about the RFP via the Questions Tab, read and review the
RFX INSTRUCTIONS, REQUIREMENTS, AND RIGHTS RESERVED BY THE UNIVERSITY
DOCUMEN
T and ALL Attributes
in the Attributes Tab. These provide valuable information and address frequently asked questions.
Potential Respondents and/or Subcontractors are encouraged to register themselves on the
Supplier Matchmaking Google Form
. Once registered, the list of interested Respondents / Subcontractors for this RFP can be viewed on the
Supplier Matchmaking List
.
Note:
None of the information on the Supplier Matchmaking List has been validated by the University
. It is YOUR responsibility to reach out to the suppliers/contacts noted on the list and confirm their information prior to considering a potential partnership. You may also consider reaching out to the
Office of Supplier Diversity.
Remember to submit your response, including attachments, early to allow time to correct errors. The submission deadline is a hard close. The system will reject responses with errors and will NOT allow late submissions.
|
| Name | Kevin Sullivan |
| Address |
1300 S. 2nd Street
Minneapolis, MN 55454 |
| Phone | |
| Fax | |
| sull0198@umn.edu |
| File Name | Description | File Size | ||
|
||||
|
RFP - UMD Roof Replacements.docx
|
Request for Proposal | 315 KB | 339763 | 7208104 |
|
RFx Instructions and Requirements - V10.pdf
|
RFx Instructions, Requirements, and Rights Reserved by the University | 257 KB | 339763 | 6930475 |
|
PWR.zip
|
Current Prevailing Wage Rates | 479 KB | 339763 | 7207954 |
|
SpHC.zip
|
Sports and Health Center Construction Drawings and Specifications | 10.32 MB | 339763 | 7207955 |
|
AB Anderson.zip
|
AB Anderson Hall Construction Drawings and Specifications | 10.52 MB | 339763 | 7207953 |
|
VK Hall.zip
|
Voss Kovach Hall Construction Drawings and Specifications | 2.35 MB | 339763 | 7207956 |
Lump Sum Request for Proposal (“RFP”) for
UMD Multi-Building Roof Replacements
RFP # 03-444-26-0216
TABLE OF CONTENTS
|
All checked Attachments listed below are part of the RFP. |
||
|
|
||
|
X |
Attachment A: |
RFP Cover Page and Declaration |
|
X |
Attachment B: |
Respondent Team Qualifications |
|
X |
Attachment C: |
Project Approach and Work Plan |
|
X |
Attachment D: |
Project Schedule |
|
X |
Attachment E: |
Project Cost |
|
X |
Attachment F: |
Targeted Business & Community Economic Development Questionnaire |
|
X |
Attachment G: |
Responsible Contractor Verification Of Compliance |
1.0
Throughout this RFP “Respondent” or “you” means the prime firm responding to this RFP.
2.0 PROJECT INFORMATION
2.1 Background
The Board of Regents of the University of Minnesota (the “University”) is requesting Proposals to provide construction services for roof replacement of three buildings located on the Duluth campus (the “Project”).
2.2 Project Description (the “Work”)
The University is seeking a contractor to provide construction services to reroof portions of Sports and Health Center, AB Anderson Hall, and Voss Kovach Hall. The University’s intent is to award this Work for all three buildings to one Respondent.
The University will issue one contract and require one set of payment and performance bonds and certificate of insurance. However, separate building permits, purchase orders, and payment applications will be made for each project/location.
Note the following details on each project:
1. Sports and Health Center (Project # 03-521-22-2021)
Address: 1216 Ordean Court, Duluth, MN 55812
Summary of Work: The reroof scope is for the replacements of roof areas "C" and "D" as noted on the drawings. Both roof areas will be installed with a multi-ply built up roofing system. There is also structural steel reinforcement required from the inside of the building. Existing suspended ceiling and lighting will need to be removed and replaced. Protection of the interior finishes will be the contractors responsibility. The University will be responsible to drain and refill the pool.
Architect/Engineer of Record: TKDA
2. AB Anderson Hall (Project # 03-550-23-2106)
Address: 1121 University Drive, Duluth, MN 55812
Summary of Work: The reroof scope is for the replacements of roof areas "A", "B", "C" and "D" as noted on the drawings. There is a mix of EPDM and multi-ply built up roofs on this project. The lightweight sloped concrete on areas "A" and "D" will need to be removed.
Architect/Engineer of Record: Architecture Advantage
3. Voss Kovach Hall (Project # 03-535-26-3886)
Address: 1305 Ordean Court, Duluth, MN 55812
Summary of Work: The reroof scope is for the replacements of roof areas "A", "B" and "B-1" as noted on the drawings. All three roof areas will be installed with a multi-ply built up roofing system.
Architect/Engineer of Record: DSGW Architecture
Refer to the attached Construction Documents for full details/requirements of each project/location.
2.3 University-Provided Information
The University has assembled the following information about the Project (collectively, the “RFP Documents”) for review by the Respondent:
• This RFP and all Attachments
• RFx Instructions, Requirements, and Rights Reserved by the University
• Current Prevailing Wage Rates
• Sports and Health Center Construction Drawings and Specifications
• AB Anderson Hall Construction Drawings and Specifications
• Voss Kovach Hall Construction Drawings and Specifications
The University has assembled the following additional RFP Documents (available to view online at the Capital Project Management Website ) for review by the Respondent:
• The Contract
• The General Conditions of the Contract for Construction
• The University’s Building Standards
• Schedule of Values Pay Application Form
However, note the RFP Documents are subject to change. The University will provide notice of any changes to the RFP via addenda. Any information provided to Respondents during the RFP process, including the documents enumerated in this Section 1.3, is provided only for your use in preparing your Proposal. Respondents shall independently evaluate the information for their use in preparing the Proposal and shall be solely responsible for their use or interpretation of the information.
2.4 Contract Sum
The selected Respondent will perform the Work for a Contract Sum that shall be a fixed, lump sum that shall include all costs necessary to complete the Work in accordance with the Contract Documents, including Respondent’s overhead and profit.
The total construction budget for this Project is $2,975,000 (current dollars, no escalation).
Individual building budgets are noted below:
• Sports and Health Center: $775,000
• AB Anderson Hall: $1,500,000
• Voss Kovach Hall: $700,000
2.5 Critical Project Schedule Dates
The University requires the Project to be substantially complete by no later than August 21, 2026.
Roofing demo cannot begin until after spring semester is complete May 11th, 2026. There may be an opportunity to start the structural steel work in Sports and Health Center prior to May 11th.
2.6 Form of Contract between the University and the Selected Respondent
2.6.1 The Contract between the selected Respondent and the University will be the University’s Construction Agreement, OGC-SC900 , which is incorporated into this RFP (the “Contract”). By submitting a Proposal, Respondent acknowledges and agrees that it received, read, understands, and shall be bound by and comply with the Contract. No exceptions or deviations to the Contract will be considered.
2.6.2 The Contract will incorporate by reference this RFP and any RFP Attachments, the General Conditions for the Contract for Construction, AIA A201-2017 , as modified by the University on January 1, 2026, and any RFP modifications agreed to by the University. The University may attach to the Contract as Supplementary Conditions Respondent’s Proposal, selected provisions of Respondent’s Proposal or modifications to Respondent’s Proposal agreed to by University and Respondent.
3.0 PROPOSAL REQUIREMENTS AND EVALUATION CRITERIA
3.1 Tentative Schedule of Selection Process
The University’s intended schedule for selection of the selected Respondent is set forth below.
|
Activity |
Date* |
|
RFP Available for Distribution |
February 16, 2026 |
|
Pre-Proposal Meeting |
February 23, 2026 at 1:00 PM |
|
Deadline for RFP Questions |
February 27, 2026 at Noon |
|
RFP Due Date |
March 9, 2026 at 2:00 PM |
|
Identification of Potential Selected Respondent |
March 18, 2026 |
|
Anticipated Authorization to Proceed |
March 23, 2026 |
*All times are noted in Central Time Zone
3.2 Pre-Proposal Meeting
A Pre-Proposal Meeting has been scheduled for the date and time noted in section 2.1 of this RFP. Attendance at this Pre-Proposal Meeting is Mandatory for prime firms that are interested in responding to this RFP. The University will not accept Proposals from Respondents that are not listed on the Pre-Proposal Meeting Sign-in Sheet that is made publicly available after the meeting via addenda.
The location of the Pre-Proposal Meeting is:
Sports and Health Center
Meet in Room 191
1216 Ordean Court
Duluth, MN 55812
Campus navigation and parking information for the Pre-Proposal Meeting can be found on our Interactive Campus Maps .
The University has not scheduled a Pre-Proposal Meeting for this RFP.
3.3 Evaluation Criteria
3.3.1 The University will evaluate Proposals against the evaluation criteria for the degree to which each Proposal meets the criteria as follows:
|
Attachment / Section |
Description |
Value |
|
Attachment A |
RFP Cover Page and Declaration |
Pass / Fail |
|
Attachment B |
Respondent Team Qualifications |
25 |
|
Attachment C |
Project Approach and Work Plan |
25 |
|
Attachment D |
Project Schedule |
10 |
|
Attachment E |
Project Cost |
30 |
|
Attachment F |
Targeted Business & Community Economic Development |
5 |
|
Attachment G |
Responsible Contractor Verification Of Compliance |
Pass / Fail |
|
Section 2.11 |
Safety |
5 |
3.3.2 In order to be considered responsive, each Respondent must complete and submit all required Attachments without any modifications to the RFP Documents. Failure to complete or follow directions within any of the Attachments may result in disqualification or loss of RFP points for said Attachment.
3.3.3 The University will evaluate each Proposal based on the criteria noted above. The Respondent selected for an award will be the one whose Proposal is responsive, responsible, and is the most advantageous to the University, as determined by the University in its sole discretion, whether or not the Proposal is the lowest cost or the highest scorer.
3.3.4 Submission of a Proposal indicates the Respondent's acceptance of the evaluation criteria.
3.4 RFP Cover Page and Declaration
The Respondent will prepare and submit the RFP Cover Page and Checklist. This completed document should be the cover page of the Respondent’s Proposal. Failure to answer “Yes” to certain questions may result in disqualification.
3.5 Respondent Team Qualification
The Respondent will prepare and submit information pertaining to their Team’s Qualification which will identify the experience of the Respondent and its Team Members. A lack of prior experience and/or working together on comparable projects may hinder your overall score. The University reserves the right to contact any noted references, consider other references, or consider Respondent’s documented past performance at the University.
3.6 Project Approach and Work Plan
The Respondent will prepare and submit information regarding their approach / plan to working on the Project.
3.7 Project Schedule
The Respondent will prepare and submit information regarding their proposed schedule for the Project. The Respondent must take into account any critical dates identified in section 1.5 when building their schedule.
3.8 Project Cost
The Respondent will prepare and submit information regarding their proposed Project cost(s).
3.9 Targeted Business and Community Economic Development
Respondents will prepare and submit as part of their Proposal, the Targeted Business (TGB) & Community Economic Development Questionnaire that is available to download and submit from the SmartCOMP tool .
By submitting a Proposal, Respondent hereby acknowledges that it has reviewed the University’s TGB policy . Respondent also agrees that in consideration for the University’s TGB program, Respondent will fulfill its commitments with regard to the TGB goals set forth in their Proposal. In addition, Respondent agrees to submit monthly reports, as directed, to substantiate compliance.
The following constitutes grounds for designation, as determined by the University in its sole discretion, as non-compliant:
• Failure to meet proposed commitments without executing good-faith efforts
• Failure to provide timely reporting
• Failure to engage in open communication
Penalties for non-compliance may include, but is not limited to, a temporary bar on receiving Targeted Business & Community Economic Development points on future RFP responses with the University.
3.10 Responsible Contractor Verification Of Compliance
Respondent acknowledges that the University has elected to voluntarily comply with Minnesota Statutes, Section 16C.285 , which sets forth minimum criteria that Respondent must meet to establish itself as a responsible contractor. “Responsible contractor” means a Respondent that conforms to the responsibility requirements in this RFP and verifies that it meets the minimum criteria set forth in Minnesota Statute, Section 16C.285 , Subdivision 3 (“Minimum Criteria”). The Minimum Criteria are included in the “Responsible Contractor Certification of Compliance” attached as Attachment G (“Compliance Certificate”). If Respondent or any subcontractor or motor carrier does not meet the Minimum Criteria or fails to verify that it meets the Minimum Criteria, it is not a responsible contractor and is not eligible to be awarded a contract for the Project or to perform work on the Project. A false statement under oath verifying compliance with any of the Minimum Criteria shall render Respondent or a subcontractor or motor carrier that makes the false statement ineligible to be awarded a contract on the Project and may result in termination of a contract awarded to Respondent or a subcontractor or motor carrier that submits a false statement.
Respondent must submit the Compliance Certificate and “First-Tier Subcontractor List” (University Document 00900) as evidence that it meets the Minimum Criteria. Failure to complete these submissions may result in disqualification. If Respondent is selected to be awarded a contract for the Project, Respondent shall submit a supplemental verification ( University Document 00901 ) containing its then-complete list of first-tier subcontractors and verifying that such subcontractors meet the Minimum Criteria. Respondent must obtain Compliance Certificates from each of its first-tier subcontractors in the forms attached as Attachment G and Attachment G-1. If Respondent retains additional subcontractors on the Project after submitting University Document 00901 , Respondent shall submit the “List of Additional Subcontractors” ( University Document 00902 ) within 14 days of retaining the additional subcontractors. Respondent shall submit to the University upon request copies of the signed Compliance Certificates from all subcontractors of any tier and all motor carriers.
Respondent may be required to furnish information or evidence as requested by the University to support or otherwise verify the statements in the Compliance Certificate(s) and verification(s). Such information shall be submitted within 3 business days of receipt of the University’s request. Failure of the Respondent to timely provide the requested information may result in the Respondent’s response being rejected.
3.11 Safety
The purpose of the safety score is to confirm that the Respondents performing the Work for the University are meeting or exceeding applicable safety, health and environmental laws, statutes, regulations, ordinances, rules, directives, and procedures.
If the Respondent currently has an active safety score with the University (available to view here ), that score will be taken into account as part of the evaluation criteria noted in this RFP. Only those Respondents with a safety score of 5.0 or greater will be considered for award.
If the Respondent does NOT currently have an active safety score, they must prepare and submit their safety information per the instructions noted here . Respondent should take the noted processing time into account when submitting their safety information.
If deemed necessary, the University may request a safety score from the selected Respondent’s subcontractor(s) prior to issuance of the Authorization to Proceed.
ATTACHMENT A: RFP COVER PAGE AND DECLARATION
|
1. Does the Respondent acknowledge that they have NOT modified or re-formatted the RFP Attachments and that NO page limit requirements have been exceeded? |
Yes |
No |
||
|
1. Does the Respondent agree to sign the Contract referenced in this RFP with no exceptions or deviations? |
Yes |
No |
||
|
1. Does the Respondent’s Proposal include the costs for an acceptable Certificate of Insurance and Payment and Performance Bonds that will meet the University’s requirements? |
Yes |
No |
||
|
1. Does the Respondent understand and agree to meet the Prevailing Wage Rate requirements for this Project? |
Yes |
No |
||
|
1. Does the Respondent agree to submit monthly documentation to the University to substantiate compliance with their proposed TGB and/or Workforce Utilization commitments for this Project? |
Yes |
N/A |
||
|
1. Did the Respondent have a representative from their firm present at the Mandatory Pre-Proposal Meeting? |
Yes |
No |
|
|
|
|
|
Respondent’s Legal Name of Firm |
|
Date of Submission |
|
|
||
|
Respondent’s Mailing Address |
|
|
|
|
||
|
Name of Respondent’s Primary Contact (to whom all future communications regarding this Proposal will be sent) |
||
|
|
|
|
|
Email Address of Respondent’s Primary Contact |
|
Phone Number of Respondent’s Primary Contact |
|
|
||
|
Name of Respondent’s Authorized Signee (to whom all future Contract documents will be sent) |
||
|
|
|
|
|
Email Address of Respondent’s Authorized Signee |
|
|
ATTACHMENT B: RESPONDENT TEAM QUALIFICATIONS
1. Complete the following Critical Team Member Experience Matrix (Attachment B-1) identifying the experience and responsibilities of the identified team members. Note the following when documenting this information:
a. Submit information for only the Project Roles specified in the Matrix. Do NOT alter the table by removing or adding additional roles.
b. List only ONE individual per role.
c. The comparable project(s) must have been commenced/completed within the last FIVE years and should be similar to the University’s Project.
d. Attach a 1-page resume for EACH individual listed in the Matrix.
2. Complete the following Additional Team Member Matrix (Attachment B-2) identifying the other key Team Members / Subcontractors that will contribute to the success of the Project. Note the following when documenting this information:
a. Attach a 1-page resume for EACH individual listed in the Matrix.
3. Complete and submit the following Project Data Sheet(s) (Attachment B-3) identifying the specific project experience of the Respondent and their Critical Team Members. Note the following when documenting this information:
a. A separate Project Data Sheet must be prepared for EACH project with only one project allowed per sheet.
b. Submit up to, and no more than, THREE total projects.
c. Listed project(s) must have been commenced/completed within the last FIVE years and should be similar to the University’s Project.
d. Listed project(s) must have been managed by the Respondent or any other firm’s on the Respondent’s team.
e. It is recommended that you list projects completed by the Team Members identified in Attachment B-1.
f. Attach any photos or additional information (no more than two pages worth) with each Project Data Sheet.
ATTACHMENT B-1: CRITICAL TEAM MEMBER EXPERIENCE
|
Project Role |
Project Manager |
Site Superintendent |
|
Name of Individual |
|
|
|
Email Address |
|
|
|
Individual’s Firm Name |
|
|
|
Individual’s Firm Location |
City, State |
City, State |
|
Years working within Firm |
# |
# |
|
Years working within Industry |
# |
# |
|
Number of projects completed with other Team Members |
1. Site Superintendent: # |
1. Project Manager: # |
|
Identify the name, cost, and completion date for up to three comparable projects |
1a. Project Name 1b. Project Cost 1c. Completion Date |
1a. Project Name 1b. Project Cost 1c. Completion Date |
|
|
2a. Project Name 2b. Project Cost 2c. Completion Date |
2a. Project Name 2b. Project Cost 2c. Completion Date |
|
|
3a. Project Name 3b. Project Cost 3c. Completion Date |
3a. Project Name 3b. Project Cost 3c. Completion Date |
|
Briefly describe the Individual’s Responsibilities for this Project |
|
|
|
Percent of Time on Project |
#% |
#% |
|
Identify the University project(s) this individual is currently, or will be, assigned to and when the individual’s responsibilities on said project(s) will be complete |
|
|
ATTACHMENT B-2: ADDITIONAL TEAM MEMBER
|
Project Role / Subcontractor |
Individual Name |
Firm Name |
Firm Location (City, State) |
|
Roofing Subcontractor |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ATTACHMENT B-3: PROJECT DATA SHEET
|
Construction Firm Name |
|
|
Project Owner |
|
|
Project Name |
|
|
Project Owner Contact |
|
|
Project Location |
City, State |
|
Project Owner Contact Email |
|
|
Construction Cost |
|
|
Project Architect Firm Name |
|
|
Construction Commencement Date |
|
|
Project Architect Contact |
|
|
Construction Completion Date |
|
|
Project Architect Contact Email |
|
|
Project Size (square feet, etc.) |
|
|
Proposed Team Members from Attachment B-1 / B-2 that worked on this project |
|
|
Type of Services Provided (Pre-Construction, Construction, etc.) |
|
|
|
|
|
Construction Delivery Method (CMAR, Design-Build, etc.) |
|
|
|
|
|
Briefly describe how this project is similar to the University’s Project. Identify any challenges you encountered on the project and briefly describe how these issues were resolved |
||||
|
|
ATTACHMENT C: PROJECT APPROACH AND WORK PLAN
NOTE: Your response to this Attachment must NOT exceed FIVE (5) pages.
You may also NOT include or reference supplemental information as an Appendix/Exhibit or in virtual form (e.g., hyperlinks to documents/videos/images stored elsewhere).
1. Describe your anticipated approach to this Project by addressing the following (at a minimum):
a. Supervision and Management
b. Site Logistics
c. Required Permitting
d. Accounting Methods
2. Itemize and describe any difficulties, challenges or risks you foresees in completing the Work on this Project. Describe how you expect to manage these difficulties, challenges or risks, and what assistance will be required from the University. In particular, address site security, safety, traffic management and other issues related to minimizing disruption on campus while performing the Work.
3. Itemize and describe any value-added services, unique product characteristics, or other cost and/or time saving benefits/advantages that will be afforded to the University in selecting the Respondent and their team for the Project.
4. Identify any concerns you noted in your review of the RFP Documents and/or any other Project/RFP requirements.
ATTACHMENT D: PROJECT SCHEDULE
1. Respondent must attach a DRAFT Critical Path Method (“CPM”) Schedule for the Project. The CPM schedule should identify tasks to be performed and/or deliverables to be provided and time frames to complete performance of the identified tasks and the expected time frame in which the Project would be completed. For readability purposes, the CPM schedule may be submitted in an 11 by 17 format. When preparing the CPM schedule, assume the following:
a) All schedule dates noted in Sections 1.5 and 2.1 of the RFP. The Respondent MUST use the Anticipated Authorization to Proceed date as the starting point of their Project Schedule. Respondent should not be doing any Work prior to this Anticipated Authorization to Proceed date.
b) University Project team reviews will occur as required by the University’s Standards and Procedures for Design. While progress on design can be made during the review periods, reviewers have two weeks to provide responses.
c) Permitting is required for various components of this Project. The University's Project Manager will cooperate in the application for building and other permits. The selected Respondent will be required to obtain and pay for all required permits, assessments, and governmental fees, licenses, and inspections, excluding Sewer Availability Charges and Water Access Charges assessed by the Metropolitan Waste Control Commission.
2. Include a written narrative that provides a detailed description of the scheduling logic and assumptions that were used when preparing the CPM Schedule.
3. State what events or issues, if any, could impede your ability to achieve the substantial completion date (or any other critical dates) stated in Section 1.5 of the RFP.
4. Identify specific strategies to avoid and/or mitigate project construction delays. Provide an estimate of the earliest start date following execution of a Contract and indicate what could delay the start of the Project.
ATTACHMENT E: PROJECT COST
|
Total Base Bid Lump Sum Cost* (NO partial bids allowed) |
|
|
A. Sports and Health Center (Project # 03-521-22-2021) |
$ |
|
A. AB Anderson Hall (Project # 03-550-23-2106) |
$ |
|
A. Voss Kovach Hall (Project # 03-535-26-3886) |
$ |
|
Total Base Bid Lump Sum Cost* |
$ |
*As a requirement of the RFP, the selected Respondent must complete the Schedule of Values Pay Application Form (as referenced in Section 1.3) and submit within two days after the Identification of Potential Selected Respondent date. Any subsequent contract change orders must be submitted using the same schedule of values format.
ATTACHMENT F: TARGETED BUSINESS &
COMMUNITY ECONOMIC DEVELOPMENT
Definitions
For University purposes, a Targeted Business (TGB) enterprise is one which is at least 51% owned and controlled by Black, Indigenous, and people of color (BIPOC), women, and/or persons with disabilities, and actively certified with one of the following University-recognized certification agencies:
• National Minority Supplier Development Council (NMSDC)
• Women's Business Enterprise National Council (WBENC)
• Disability:IN
• Central (CERT) Certification Program
• State of Minnesota Dept of Administration TG
• Minnesota Unified Certification Program (MnUCP)
• Service-Disabled Veteran Small Business Certification (VetCert)
TGB Program Administration and Requirements
The University of Minnesota’s TGB Program is administered by the Office for Supplier Diversity (OSD).
A Respondent demonstrates its commitment to supporting the University’s supplier diversity goals by engaging Targeted Businesses as subcontractors/suppliers on this Contract at a meaningful level of participation relative to the size, type, and location of the Project.
The following goals and requirements apply for this Project:
• Participation of Targeted Businesses equal to or greater than thirteen percent (13%) of the Base Bid/Proposal costs.
• No less than 75% of the work or material contracted to the identified TGB enterprise(s) must be performed or supplied by said TGB enterprise(s).
Workforce Utilization Requirements
Workforce levels of participation (based on goals set by the MN Department of Human Rights ) for the Project are:
|
Region |
Goals |
|
Northeast Minnesota |
• 12% BIPOC Employees; • 9% Female Employees; • 2% Disabled Employees. |
A Respondent demonstrates its commitment to prevent discrimination in employment by:
• Its inclusion of BIPOC, women, and persons with disabilities on its permanent staff;
• Its inclusion of BIPOC, women, and persons with disabilities on its planned workforce on this Project;
• Possession of a Workforce Certificate and an Equal Pay Certificate, issued by the State of Minnesota.
Business & Community Economic Development
A Respondent demonstrates its commitment to improve the economic conditions in communities in which the University construction projects are located by:
• Its current practice of funding, providing personnel to and/or soliciting employees from programs designed to train residents of the targeted areas designated by each city pursuant to Minnesota Statute Section 469.202 .
• Its agreement to participate during this project with the University to fund, provide personnel to, and/or solicit employees from programs designed to train residents of the targeted areas designated by each city pursuant to Minnesota Statute Section 469.202 .
RFP Requirements
Respondent shall complete and submit the Targeted Business & Community Economic Development Questionnaire. The questionnaire for this RFP (which is available to complete and submit from the SmartCOMP tool) must be submitted prior to the Proposal Due Date noted in section 2.1.
Award Requirements
Once the Authorization to Proceed has been issued, the selected Respondent shall be prepared to submit the following documentation to substantiate compliance of TGB commitments and/or Workforce Utilization goals:
1. Submitted to OSD (via the SmartCOMP tool)
a. Workforce Utilization (Document 659) on or before the 10th of each month for all onsite labor the previous month.
b. TGB Payment Affidavit(s) (Document 660) on or before the 10th of each month for payments made the previous month, if any.
c. TGB Work Verification (Document 661) when the contracted TGB work is complete.
ATTACHMENT G: RESPONSIBLE CONTRACTOR VERIFICATION OF COMPLIANCE (UNIVERSITY DOCUMENT 00900)
Minnesota Statutes, Section ...

With GovernmentContracts, you can:
...Union Partial Roof Replacement) Issue Date & Time 6/4/2026 10:08:42 AM (CT) Close ...
University of Minnesota
Bid Due: 6/25/2026
...Science and Montessori Programs Crossroads Roof Replacement 4120-27-01 - BY INVITATION ONLY EVENT ...
Saint Paul Public Schools
Bid Due: 6/25/2026
...to the Executive Aviation Building at Flying Cloud Airport. The work includes replacement ...
Metropolitan Airports Commission (MAC)
Bid Due: 6/16/2026