| Location: | Federal |
|---|---|
| Posted: | Oct 4, 2024 |
| Due: | Nov 4, 2024 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N0038324QT556 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
Repair Turnaround Time (RTAT) definition: The contractual delivery requirement
is measured from asset Return to the date of asset acceptance under the terms
of the contract. For purposes of this section, Return is defined as physical
receipt of the F-condition asset at the contractor?s facility as reflected in
the Action Date entry in the Commercial Asset Visibility (CAV) system. In
accordance with the CAV Statement of Work, the contractor is required to
accurately report all transactions by the end of the fifth regular business
day after receipt and the Action Date entered in CAV must be dated to reflect
the actual date of physical receipt.
The Contractor must obtain final inspection and acceptance by the Government
for all assets within the RTATs established in the subsequent contract.
Required RTAT: 0208 days after receipt of asset
Throughput Constraint: Contractor must provide a throughput Constraint for
eachNSN(s). Total assets to be repaired monthly after initial delivery
commences X/(contractor fill in #). A throughput of ##____ per month reflects
no throughputconstraint.
Induction Expiration Date: 365 days after contract award date. Any asset
received after this date in days is not authorized for repair without
bi-lateral agreement between the Contractor and NAVSUP WSS Contracting
Officer.
Reconciliation:A reconciliation modification will be issued after final
Inspection and acceptance of all assets inducted under the subsequent
contract. The parties have agreed to a price (shown on the schedule page) for
each unit at the negotiated RTAT. Such prices are based on the Contractor
meeting the RTAT requirements described within the schedule page. If the
Contractor does not meet the applicable RTAT requirement, consideration will
be assessed and subject to negotiation.
All contractual documents (i.e. contracts, purchase orders, task orders,
delivery orders, and modifications) related to the instant procurement are
considered to be "issued" by the Government when copies are either depositedin
the mail, transmitted by facsimile, or sent by other electronic commerce
methods, such as email. The Government’s acceptance of the contractor’s
proposal constitutes bilateral agreement to "issue" contractual documents as
detailed herein.
Early and incremental deliveries accepted and preferred.
INSPECTION AT ORIGIN
ACCEPTANCE AT ORIGIN
POC EMAIL: CAROLYN.A.CLARK30.CIV@US.NAVY.MIL
The purpose of this amendment is to:
Update the NAICS code entry under clause 52.204-8.
The correct NAICS code for this solicitation is: 332215.
All other terms and conditions remain unchanged.
| Sep 11, 2024 | [Presolicitation (Original)] 73--OVEN,WARMING,ELECTR, IN REPAIR/MODIFICATION OF |

With GovernmentContracts, you can:
Follow 48--VALVE, HULL/BACKUP Active Contract Opportunity Notice ID N0010426RZA99 Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 6/16/2026
Follow 48--VALVE,CHECK Active Contract Opportunity Notice ID SPE7MC26T039Z Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow 41--FAN,CENTRIFUGAL Active Contract Opportunity Notice ID SPE8E726T2764 Related Notice Department/Ind. Agency DEPT
DEPT OF DEFENSE
Bid Due: 6/08/2026
Follow 30--CYLINDER ASSEMBLY,A Active Contract Opportunity Notice ID SPE7L126T615A Related Notice Department/Ind. Agency
DEPT OF DEFENSE
Bid Due: 6/08/2026