| Location: | Texas |
|---|---|
| Posted: | May 27, 2026 |
| Due: | Jun 3, 2026 |
| Agency: | San Antonio Housing Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2602-5653 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Housing Authority of the City of San Antonio, Texas, and its affiliated entities a/k/a Opportunity Home San Antonio is in the development stages of a U.S. Housing and Urban Development (HUD) approved self-managed energy performance contract phase III (EPC). An EPC is a financing tool where energy and water conservation measures (ECM) are financed and installed through future utility savings generated through reduced utility consumption. Examples of ECMs include lighting retrofits, low flow plumbing fixtures, appliances, building envelope improvements, furnaces, water heaters, boilers, and other energy and water savings improvements. A complete overview of Opportunity Home’s EPC can be found in Attachment A – Investment Grade Energy Audit and Performance Bid Specifications.

With GovernmentContracts, you can:
...is soliciting bids for construction of a new Farm Teaching Facility, including associated ...
Texas A&M University
Bid Due: 7/29/2026
...engineering, site lighting design, utility coordination, and construction document preparation. PEDC... to complete ...
City of Pasadena
Bid Due: 7/27/2026
...And Repair; 91356-Construction, Utility/Underground Projects; 91359-Construction And Upgrades.../Item Code: 72052-Propeller Pumps, Vertical; 91063-Public ...
State Government of Texas
Bid Due: 8/06/2026
...Engineering and Design * CTMS Engineering and Design * Surveying * SUE/Utility Coordination... ...
Harris County
Bid Due: 8/10/2026