| Location: | South Carolina |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Aug 19, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2026-003 |
| Publication URL: | To access bid details, please log in. |
The project is to construct a new 33’ x 53’ athletic fields storage building with brick veneer, cmu load bearing masonry, roof joists and standing seam metal roofing. Interior lighting, exhaust systems, entry doors all as similar to an existing storage building located near the existing football field / track. The new building will be located on the opposite side.

With GovernmentContracts, you can:
...: Design-Bid-Build Construction Cost Range: $1,235,000 to $1,305,000 Agency Project Coordinator... and support ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/17/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project...: Improvements include ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/25/2026
...and hardware. Documents May Be Obtained From: Scherrie Cogdill, Director of Design and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...29104 Project Delivery Method: Design-Build Construction Cost Range: $96,000 Agency Project... with applicable ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/15/2026