| Location: | South Carolina |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Aug 14, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | E26-9866-ML |
| Publication URL: | To access bid details, please log in. |
Install three hydronic gas-fired boilers along with all associated piping, circulation pumps, valves, intake air vents, and exhaust flues. Modify mechanical controls in accordance with the design documents. Revise the existing electrical system to accommodate the new mechanical equipment.

With GovernmentContracts, you can:
...Columbia, SC 29208 Project Delivery Method: Design-Bid-Build Construction Cost Range: $2,100,000... with a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/11/2026
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator..., fixtures, base ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Project Name: YTC - Capital Renewal - Mechanical Projects - Computer Lab HVAC ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/18/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... will be ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026