| Location: | South Carolina |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Aug 14, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | E26-9866-ML |
| Publication URL: | To access bid details, please log in. |
Install three hydronic gas-fired boilers along with all associated piping, circulation pumps, valves, intake air vents, and exhaust flues. Modify mechanical controls in accordance with the design documents. Revise the existing electrical system to accommodate the new mechanical equipment.

With GovernmentContracts, you can:
...Method: Design-Bid-Build Construction Cost Range: $2,000,000 to $2,500,000 Agency Project Coordinator... suspended ceilings, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...Delivery Method: Design-Bid-Build Construction Cost Range: $1,750,000 to $2,250,000 Agency Project... in a ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 6/30/2026
...:00pm Project Location: 4700 Broad River Road, Columbia SC Project Delivery Method: Design-Bid-Build...-filter, ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/06/2026
...elevation boardwalk and structures; electrical and mechanical improvements; plumbing; playground.../contractors for Construction Manager ...
City of Clemson
Bid Due: 6/30/2026