| Location: | South Carolina |
|---|---|
| Posted: | Jul 30, 2025 |
| Due: | Aug 14, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | E26-9866-ML |
| Publication URL: | To access bid details, please log in. |
Install three hydronic gas-fired boilers along with all associated piping, circulation pumps, valves, intake air vents, and exhaust flues. Modify mechanical controls in accordance with the design documents. Revise the existing electrical system to accommodate the new mechanical equipment.

With GovernmentContracts, you can:
...Delivery Method: Design-Bid-Build Construction Cost Range: n/a Agency Project Coordinator: Mosely... Designs Email: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 9/02/2026
...Delivery Method: Design-Bid-Build Agency Project Coordinator: BLAKE BARBARE Email: BLAKE.BARBARE... of an engineering ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/17/2026
...of a conceptual design for the replacement new Miriam Brown Community Center. Full ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/06/2026
...School District One Anticipated Project Delivery Method: Design-Bid-Build Agency Project Coordinator... term Indefinite ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026